公开(公告)号:US09423781B2
公开(公告)日:2016-08-23
申请号:US13853332
申请日:2013-03-29
Applicant: General Electric Company
Inventor: Victor John Morgan , Tomas A. Velez
CPC classification number: G05B17/02
Abstract: A method to control an power generation plant including: applying control settings to operate the plant; collecting plant data indicative of the performance of the plant; applying the control settings to a model of the plant; collecting prediction data from the model; comparing the plant data to the predicted data and adjusting the control settings applied to the plant and model; perturbing the control settings and applying the perturbed control settings to operate the plant and the model; collecting perturbed plant data and perturbed prediction data, and modifying the model if the perturbed plant data represents an improvement as compared to the perturbed prediction data.
Abstract translation: 一种控制发电厂的方法,包括:对工厂进行控制设定; 收集指示工厂性能的工厂数据; 将控制设置应用于工厂的模型; 从模型收集预测数据; 将工厂数据与预测数据进行比较,并调整应用于工厂和模型的控制设置; 扰乱控制设置并应用扰动控制设置来操作设备和模型; 收集扰动的植物数据和扰动的预测数据,以及如果扰动的植物数据表示与扰动的预测数据相比的改进,则修改该模型。
-
公开(公告)号:US20140297053A1
公开(公告)日:2014-10-02
申请号:US13853332
申请日:2013-03-29
Applicant: GENERAL ELECTRIC COMPANY
Inventor: Victor John MORGAN , Tomas A. Velez
IPC: G05B13/02
CPC classification number: G05B17/02
Abstract: A method to control an power generation plant including: applying control settings to operate the plant; collecting plant data indicative of the performance of the plant; applying the control settings to a model of the plant; collecting prediction data from the model; comparing the plant data to the predicted data and adjusting the control settings applied to the plant and model; perturbing the control settings and applying the perturbed control settings to operate the plant and the model; collecting perturbed plant data and perturbed prediction data, and modifying the model if the perturbed plant data represents an improvement as compared to the perturbed prediction data.
Abstract translation: 一种控制发电厂的方法,包括:对工厂进行控制设定; 收集指示工厂性能的工厂数据; 将控制设置应用于工厂的模型; 从模型收集预测数据; 将工厂数据与预测数据进行比较,并调整应用于工厂和模型的控制设置; 扰乱控制设置并应用扰动控制设置来操作设备和模型; 收集扰动的植物数据和扰动的预测数据,以及如果扰动的植物数据表示与扰动的预测数据相比的改进,则修改该模型。
-