-
1.
公开(公告)号:US20140324535A1
公开(公告)日:2014-10-30
申请号:US13874272
申请日:2013-04-30
Applicant: HEWLETT-PACKARD DEVELOPMENT COMPANY, L.P.
Inventor: Yuan CHEN , Zhenhua Liu , Cullen E. Bash
IPC: G06Q30/02
CPC classification number: G06Q30/0202
Abstract: According to an example, power infrastructure sizing and workload management of an entity may include receiving power supply and information technology (IT) workload demand input parameter specifications for the entity, and using the power supply and IT workload demand input parameter specifications for a power infrastructure sizing and workload management model for the entity. The power infrastructure sizing and workload management model may be used to generate power supply and IT workload demand output parameter specifications for the entity.
Abstract translation: 根据一个示例,实体的电力基础设施规模和工作负载管理可以包括为实体接收供电和信息技术(IT)工作负载需求输入参数规范,以及使用电力基础设施的电源和IT工作负载需求输入参数规范 实体的大小和工作量管理模型。 电力基础设施规模和工作负载管理模式可用于为实体生成电源和IT工作负载需求输出参数规范。