Abstract:
The device for pre-heating cement raw meal for the cement clinker production comprises at least one heat exchanger line for charging cement raw meal in countercurrent flow to the hot gases drawn through the heat exchanger line and a supporting structure (19) for the at least one heat exchanger line, wherein the heat exchanger line comprises a plurality of heat exchangers (8, 9, 10) which are interconnected and through which flow can pass consecutively. The supporting structure (19) comprises stands (20) which jointly form a triangular outline (21) and serve to transfer load into at least one foundation.
Abstract:
In a method for reprocessing wet waste materials containing organic components, in particular sludges in a cement clinker production plant, in which raw meal is preheated in a preheater (3) in countercurrent flow to the hot exhaust gases of a clinker furnace (2), and calcined in a calciner (4) fired with alternative fuels, the wet waste materials are dried in a drying unit (18) using a hot gas produced from the preheater waste heat and the dried waste materials and the drier exhaust gases are discharged from the drying unit (18), wherein the drier exhaust gases are introduced into the calciner (4).