-
公开(公告)号:US20100023147A1
公开(公告)日:2010-01-28
申请号:US12180578
申请日:2008-07-28
申请人: Ivory W. Knipfer , Jason S. Lee , Francis E. del Rosario , Antoine G. Sater , Hao H. Xu , Hui Zhang
发明人: Ivory W. Knipfer , Jason S. Lee , Francis E. del Rosario , Antoine G. Sater , Hao H. Xu , Hui Zhang
IPC分类号: G06F19/00
CPC分类号: G06Q10/087 , G06Q30/0635
摘要: A method for reconfiguring a partially manufactured product during a manufacturing process is disclosed. The method can include reading a configuration of the partially manufactured product and reading at least one order for a manufactured product, wherein each order is associated with a target configuration. The method can further include reading a set of rules that match a given configuration with one of a set of target configurations and executing the set of rules upon the configuration of the partially manufactured product so as to match the configuration of the partially manufactured product with one of a target configuration of the at least one order. The method can further include initiating re-configuration of the partially manufactured product to the target configuration with which it was matched. Thus, the partially manufactured product is reused in the manufacturing process to fulfill an order it was not originally created to fulfill.
摘要翻译: 公开了一种在制造过程中重新配置部分制造的产品的方法。 该方法可以包括读取部分制造的产品的配置并读取制造的产品的至少一个订单,其中每个订单与目标配置相关联。 该方法还可以包括将一组与给定配置匹配的一组规则与目标配置集合中的一个进行读取,并且在部分制造的产品的配置上执行该组规则,以便将部分制造的产品的配置与一个 的至少一个订单的目标配置。 该方法还可以包括将部分制造的产品重新配置为与其匹配的目标配置。 因此,部分制造的产品在制造过程中重复使用,以实现其最初未创建的订单。
-
公开(公告)号:US08010217B2
公开(公告)日:2011-08-30
申请号:US12180578
申请日:2008-07-28
申请人: Ivory W. Knipfer , Jason S. Lee , Francis E. del Rosario , Antoine G. Sater , Hao H. Xu , Hui Zhang
发明人: Ivory W. Knipfer , Jason S. Lee , Francis E. del Rosario , Antoine G. Sater , Hao H. Xu , Hui Zhang
CPC分类号: G06Q10/087 , G06Q30/0635
摘要: A method for reconfiguring a partially manufactured product for a canceled custom-built order during a manufacturing process includes canceling a custom-built order for a product that has been partially manufactured. The method also includes reading a configuration of the partially manufactured product for the custom-built order that has been canceled, and reading at least one order for a different manufactured product, wherein each order is associated with a target configuration. The method yet further includes reading a set of rules that match a given configuration with one of a set of target configurations and executing the set of rules upon the configuration of the partially manufactured product so as to match the configuration of the partially manufactured product with one of a target configuration of the at least one order. Finally, the method includes initiating re-configuration of the partially manufactured product to the target configuration with which it was matched to produce the different manufactured product corresponding to the at least one order in lieu of the custom-built order that had been canceled.
摘要翻译: 一种用于在制造过程中重新配置被取消的定制订单的部分制造的产品的方法包括取消已部分制造的产品的定制订单。 该方法还包括读取已被取消的定制订单的部分制造的产品的配置,以及读取不同制造产品的至少一个订单,其中每个订单与目标配置相关联。 该方法还包括读取一组与给定配置匹配的一组规则与一组目标配置中的一个,并且在部分制造的产品的配置上执行该组规则,以便将部分制造的产品的配置与一个 的至少一个订单的目标配置。 最后,该方法包括将部分制造的产品重新配置为与其匹配的目标配置,以产生与至少一个订单相对应的不同的制成品,以代替已被取消的定制订单。
-