摘要:
The present invention provides set retarding additives, set retarded hydraulic cement compositions and methods of using the set retarded cement compositions for cementing subterranean zones in wells. A preferred set retarding additive comprises an alkanolamine salt produced by the reaction of a hydroxy carboxy acid, such as tartaric acid, gluconic acid or glucoheptonic acid, with an alkanolamine, such as monoethanolamine, diethanolamine or triethanolamine.
摘要:
The present invention provides set retarding additives, set retarded hydraulic cement compositions and methods of using the set retarded cement compositions for cementing subterranean zones in wells. A preferred set retarding additive comprises an alkanolamine salt produced by the reaction of a hydroxy carboxy acid, such as tartaric acid, gluconic acid or glucoheptonic acid, with an alkanolamine, such as monoethanolamine, diethanolamine or triethanolamine.
摘要:
The present invention provides cementitious well drilling fluids and methods of drilling subterranean well bores. The drilling fluids are basically comprised of water, a water viscosity increasing material and a cementitious material which when deposited on the walls of the well bore as a part of the filter cake thereon consolidates the filter cake into a stable mass that readily bonds to a cementitious material slurry subsequently placed in the well bore. The methods of drilling a subterranean well bore are basically comprised of the steps of preparing a drilling fluid of the invention and drilling a subterranean well bore using the drilling fluid.
摘要:
A test method for foamed cement does not transfer the test composition under pressure from one device to another and the equipment is not handled under dangerous pressure, thereby providing a safe test method. Steps include: rotating a paddle at a first speed in a pressurized foamable cement composition in a receptacle in a high pressure, high temperature chamber such that the foamable cement composition becomes a foamed cement; rotating the paddle at a second speed in the pressurized foamed cement for a selected time period; maintaining the foamed cement static after the selected time period and increasing temperature in the chamber during a foamed cement setting period; thereafter reducing temperature in the chamber and reducing pressure in the chamber; removing the foamed cement in a set condition and the paddle from the chamber; removing the set foamed cement from the paddle; and testing the removed foamed cement.
摘要:
A method of forming in a desired location in a well bore a dual-state composite of a hardened hydraulic cement and a solid rubber which features the use of a composition consisting essentially of a mixture of a slurry of a hydraulic cement and a vulcanizable rubber latex.
摘要:
Well completion methods utilizing rubber latex compositions are provided. The compositions are comprised of an aqueous suspension of rubber, a vulcanizing agent and a vulcanization activator, and are placed in a subterranean formation or a well bore at a desired location therein and allowed to vulcanize whereby a solid rubber plug or seal is formed.