Reservoir Pressure Monitoring
    1.
    发明申请
    Reservoir Pressure Monitoring 审中-公开
    水库压力监测

    公开(公告)号:US20120048539A1

    公开(公告)日:2012-03-01

    申请号:US13215379

    申请日:2011-08-23

    IPC分类号: E21B47/06

    CPC分类号: E21B47/06

    摘要: A method of completing a wellbore that includes providing wellbore casing having shaped charges and permanent pressure gauges on an outer surface of the casing. In an example of use, the casing is inserted into the wellbore and cement is injected into an annulus formed between the casing and wellbore. The shaped charges are strategically deployed on the casing so they aim towards a wall of the wellbore and are spaced apart along the casing. Thus detonating the shaped charges creates perforations into a formation around the wellbore and places the pressure gauges into pressure communication with the formation. Pressure readings are delivered to the surface from the pressure gauges in the form of signals.

    摘要翻译: 一种完成井筒的方法,其包括在壳体的外表面上提供具有成形装料和永久压力计的井眼套管。 在使用的示例中,将壳体插入井眼中,并且将水泥注入形成在壳体和井筒之间的环形空间中。 成形的装料战略性地部署在壳体上,因此它们朝向井眼的壁并且沿着壳体间隔开。 因此引爆成形的电荷会在井筒周围的地层中产生穿孔,并将压力表与地层压力连通。 压力读数以信号的形式从压力表输送到表面。