公开(公告)号:US20130025858A1
公开(公告)日:2013-01-31
申请号:US13577120
申请日:2011-02-03
申请人: Lars Høier , Jostein Alvestad , Aurelie Lagisquet , Eimund Gilje
发明人: Lars Høier , Jostein Alvestad , Aurelie Lagisquet , Eimund Gilje
IPC分类号: E21B43/22
CPC分类号: E21B43/24
摘要: A process for the recovery of hydrocarbon such as bitumen/EHO from a hydrocarbon bearing formation in which are situated an upper injection well and a lower production well, the method comprising the steps: preheating an area around and between the wells by circulating hot solvent through the completed interval of each of the wells until sufficient hydraulic communication between both wells is achieved; injecting one of more hydrocarbon solvents into the upper injection well at or above critical temperature of the solvent or solvent mixture, thereby causing a mixture of hydrocarbon and solvent to flow by gravity drainage to the lower production well; and producing the hydrocarbon to the surface through the lower production well. A non-condensable gas may be injected into the solvent chamber created by the hydrocarbon solvent.
摘要翻译: 一种从含烃地层中回收烃类沥青/ EHO的方法,其中位于上部注入井和较低的生产井中,该方法包括以下步骤:通过循环热溶剂通过 每个井的完井间隔达到两井之间充分的液压连通; 在溶剂或溶剂混合物的临界温度或更高的温度下将更多的烃溶剂注入上部注入井中,从而使烃和溶剂的混合物通过重力排放流向下部生产井; 并通过较低的生产井将烃生产到表面。 可以将不可冷凝的气体注入由烃溶剂产生的溶剂室中。
-
公开(公告)号:US20130000894A1
公开(公告)日:2013-01-03
申请号:US13576956
申请日:2011-02-03
CPC分类号: E21B43/24 , C09K8/592 , E21B43/2408
摘要: A process for the recovery of hydrocarbon such as bitumen/EHO from a hydrocarbon bearing formation in which are situated an upper injection well and a lower production well, the method comprising the steps: preheating an area around and between the wells by circulating hot solvent through the completed interval of each of the wells until sufficient hydraulic communication between both wells is achieved; injecting one of more hydrocarbon solvents into the upper injection well at or above critical temperature of the solvent or solvent mixture, thereby causing a mixture of hydrocarbon and solvent to flow by gravity drainage to the lower production well; and producing the hydrocarbon to the surface through the lower production well.
摘要翻译: 一种从含烃地层中回收烃类沥青/ EHO的方法,其中位于上部注入井和较低的生产井中,该方法包括以下步骤:通过循环热溶剂通过 每个井的完井间隔达到两井之间充分的液压连通; 在溶剂或溶剂混合物的临界温度或更高的温度下将更多的烃溶剂注入上部注入井中,从而使烃和溶剂的混合物通过重力排放流向下部生产井; 并通过较低的生产井将烃生产到表面。
-
公开(公告)号:US10094208B2
公开(公告)日:2018-10-09
申请号:US13577120
申请日:2011-02-03
申请人: Lars Høier , Jostein Alvestad , Aurelie Lagisquet , Eimund Gilje
发明人: Lars Høier , Jostein Alvestad , Aurelie Lagisquet , Eimund Gilje
摘要: A process for the recovery of hydrocarbon such as bitumen/EHO from a hydrocarbon bearing formation in which are situated an upper injection well and a lower production well, the method comprising the steps: preheating an area around and between the wells by circulating hot solvent through the completed interval of each of the wells until sufficient hydraulic communication between both wells is achieved; injecting one or more hydrocarbon solvents into the upper injection well at or above critical temperature of the solvent or solvent mixture, thereby causing a mixture of hydrocarbon and solvent to flow by gravity drainage to the lower production well; and producing the hydrocarbon to the surface through the lower production well. A non-condensable gas may be injected into the solvent chamber created by the hydrocarbon solvent.
-
公开(公告)号:US09115577B2
公开(公告)日:2015-08-25
申请号:US13576956
申请日:2011-02-03
CPC分类号: E21B43/24 , C09K8/592 , E21B43/2408
摘要: A process for the recovery of hydrocarbon such as bitumen/EHO from a hydrocarbon bearing formation in which are situated an upper injection well and a lower production well, the method comprising the steps: preheating an area around and between the wells by circulating hot solvent through the completed interval of each of the wells until sufficient hydraulic communication between both wells is achieved; injecting one of more hydrocarbon solvents into the upper injection well at or above critical temperature of the solvent or solvent mixture, thereby causing a mixture of hydrocarbon and solvent to flow by gravity drainage to the lower production well; and producing the hydrocarbon to the surface through the lower production well.
摘要翻译: 一种从含烃地层中回收烃类沥青/ EHO的方法,其中位于上部注入井和较低的生产井中,该方法包括以下步骤:通过循环热溶剂通过 每个井的完井间隔达到两井之间充分的液压连通; 在溶剂或溶剂混合物的临界温度或更高的温度下将更多的烃溶剂注入上部注入井中,从而使烃和溶剂的混合物通过重力排放流向下部生产井; 并通过较低的生产井将烃生产到表面。
-
-
-