-
1.
公开(公告)号:US10731451B2
公开(公告)日:2020-08-04
申请号:US16284594
申请日:2019-02-25
Applicant: PetroChina Company Limited
Inventor: Yonggui Mei , Quanjiang Zhang , Biyun Zhu , Xianzhi Wang , Jian Guo , Wuchang Zhang , Xiaohua Lian , Shengfa Mao , Zhanxin Xue , Liuping Deng
Abstract: An exploitation method and an exploitation well pattern for coalbed methane in a low-permeability coalbed. The method comprises: determining a maximum principal stress direction in a low-permeability coalbed; disposing at least two large-roadway horizontal wells in the low-permeability coalbed; disposing a plurality of production wells on two sides of a horizontal segment of each of the at least two large-roadway horizontal wells, wherein a diameter of each of the production wells is smaller than a diameter of the horizontal segment; exploiting the coalbed methane in the low-permeability coalbed through the at least two large-roadway horizontal wells and the plurality of production wells. Through the horizontal segments of the large-roadway horizontal wells perpendicular to the maximum principal stress direction, it promotes stress release in low-permeability coalbed to form more fracture channels, thereby improving the exploitation efficiency of the coalbed methane in the low-permeability coalbed.
-
2.
公开(公告)号:US20190186252A1
公开(公告)日:2019-06-20
申请号:US16284594
申请日:2019-02-25
Applicant: PetroChina Company Limited
Inventor: Yonggui Mei , Quanjiang Zhang , Biyun Zhu , Xianzhi Wang , Jian Guo , Wuchang Zhang , Xiaohua Lian , Shengfa Mao , Zhanxin Xue , Liuping Deng
Abstract: The present disclosure discloses an exploitation method and an exploitation well pattern for coalbed methane in a low-permeability coalbed. The method comprises: determining a maximum principal stress direction in a low-permeability coalbed (1); disposing at least two large-roadway horizontal wells (3) in the low-permeability coalbed (1); disposing a plurality of production wells (4) on two sides of a horizontal segment (31) of each of the at least two large-roadway horizontal wells (3), wherein a diameter of each of the production wells (4) is smaller than a diameter of the horizontal segment (31) of the large-roadway horizontal well (3); exploiting the coalbed methane in the low-permeability coalbed through the at least two large-roadway horizontal wells (3) and the plurality of production wells (4). Through the horizontal segments (31) of the large-roadway horizontal wells (3) perpendicular to the maximum principal stress direction, the present disclosure promotes the stress release in low-permeability coalbed forms more fracture channels, thereby achieving the exploitation of the coalbed methane through the at least two large-roadway horizontal wells and the plurality of production wells, and improving the exploitation efficiency of the coalbed methane in the low-permeability coalbed.
-