-
公开(公告)号:US20200308896A1
公开(公告)日:2020-10-01
申请号:US16898998
申请日:2020-06-11
摘要: Prior to dry-in of a building, constructing an outer frame within an external opening of the building by attaching a top piece to a top, attaching a first side piece to a first side, attaching a second side piece to a second side, and attaching a bottom piece to a bottom of the building opening. After constructing the outer frame within the external opening of the building, the method includes mounting glass to glass receiving surfaces of the top piece, the first side piece, the second side piece, and the bottom piece. After dry-in and interior wall finishing of the building, the method includes attaching a plurality of inner base caps to an interior of the outer frame. After dry-in and exterior wall finishing of the building, the method includes attaching a plurality of outer base caps to an exterior of the outer frame.
-
公开(公告)号:US20180135346A1
公开(公告)日:2018-05-17
申请号:US15812140
申请日:2017-11-14
摘要: A storefront system includes an outer frame having a top piece, a first side piece, a second side piece, and a bottom piece. The top piece has a glass receiving surface, an inner base cap receiving structure, and an outer base cap receiving structure. The first side piece has a glass receiving surface, an inner base cap receiving structure, and an outer base cap receiving structure. The second side piece has a glass receiving surface, an inner base cap receiving structure, and an outer base cap receiving structure. The bottom piece has a bottom piece cross section defined by a glass receiving surface. The storefront system has at least one inner base cap, at least one outer base cap, and glass. The storefront system may also include one or more vertical mullions and one or more horizontal mullions and/or include hinged doors.
-
公开(公告)号:US10941605B2
公开(公告)日:2021-03-09
申请号:US16898998
申请日:2020-06-11
摘要: Prior to dry-in of a building, constructing an outer frame within an external opening of the building by attaching a top piece to a top, attaching a first side piece to a first side, attaching a second side piece to a second side, and attaching a bottom piece to a bottom of the building opening. After constructing the outer frame within the external opening of the building, the method includes mounting glass to glass receiving surfaces of the top piece, the first side piece, the second side piece, and the bottom piece. After dry-in and interior wall finishing of the building, the method includes attaching a plurality of inner base caps to an interior of the outer frame. After dry-in and exterior wall finishing of the building, the method includes attaching a plurality of outer base caps to an exterior of the outer frame.
-
-