Abstract:
The present disclosure includes systems and methods for 100% duty cycle in switching regulators. A switching regulator circuit includes a ramp generator to produce a ramp signal having a period and a comparator to receive the ramp signal and an error signal, and in accordance therewith, produce a modulation signal. In a first mode of operation, the ramp signal increases to intersect the error signal, and in accordance therewith, changes a state of a switching transistor during each period of the ramp signal. In a second mode of operation, the error signal increase above a maximum value of the ramp signal, and in accordance therewith, the switching transistor is turned on for one or more full periods of the ramp signal.
Abstract:
Exemplary embodiments are related to detecting a reverse-boosting operation of a battery charger. A device may include a plurality of switches for receiving an input voltage at an input port and conveying an output voltage. The device may also include a first sensing device coupled to the input port configured to detect if an input current is less than a threshold current. Further, the device may include a second sensing device selectively coupled to the input port to detect if the input voltage is less than a threshold voltage.
Abstract:
The present disclosure includes systems and methods for 100% duty cycle in switching regulators. A switching regulator circuit includes a ramp generator to produce a ramp signal having a period and a comparator to receive the ramp signal and an error signal, and in accordance therewith, produce a modulation signal. In a first mode of operation, the ramp signal increases to intersect the error signal, and in accordance therewith, changes a state of a switching transistor during each period of the ramp signal. In a second mode of operation, the error signal increase above a maximum value of the ramp signal, and in accordance therewith, the switching transistor is turned on for one or more full periods of the ramp signal.