-
公开(公告)号:US20230036153A1
公开(公告)日:2023-02-02
申请号:US17464837
申请日:2021-09-02
Applicant: Raytheon Technologies Corporation
Inventor: William D. Owen , Benjamin D. Hall , Emily Carolyn Roto Coleman , Cami Santor , Eric D. Kachel , Alex J. Brown
Abstract: A process for scheduling engine inspection for a gas turbine engine includes computing an expected damage increment based on aircraft usage data of a single flight, computing a cumulative expected damage by summing the expected damage increment with a total set of historical expected damage increments since a previous maintenance, and determining an aggregate risk of failure based on the computed cumulative expected damage. A manual inspection is signaled when the aggregate risk of failure exceeds an acceptable risk threshold.