ARRANGEMENT AND METHOD OF UTILIZING ROCK DRILLING INFORMATION
    2.
    发明申请
    ARRANGEMENT AND METHOD OF UTILIZING ROCK DRILLING INFORMATION 审中-公开
    使用岩石钻井信息的安排和方法

    公开(公告)号:US20170016325A1

    公开(公告)日:2017-01-19

    申请号:US15105772

    申请日:2013-12-17

    CPC classification number: E21C39/00 E21B7/025 E21C35/24 E21D9/006 E21D20/003

    Abstract: An arrangement and method of utilizing rock drilling information in a mine whereby drill holes are drilled in a surrounding rock material by a first mining vehicle. During drilling measuring data is produced and is inputted to a monitoring device for analyzing procedures. The monitoring device produces rock condition data of the rock material being drilled. The produced rock condition data is then implemented in a second mining vehicle.

    Abstract translation: 一种在矿井中利用岩石钻井信息的布置和方法,其中由第一采矿车辆在周围的岩石材料中钻出钻孔。 在钻探期间,产生测量数据并将其输入到用于分析过程的监控装置。 监测装置产生待钻岩石的岩石状况数据。 然后在第二采矿车辆中实施产生的岩石状态数据。

Patent Agency Ranking