ANTI IDLING CHANNEL AND CORNER BLOCK MECHANISM AND METHOD OF INSTALLATION
    2.
    发明申请
    ANTI IDLING CHANNEL AND CORNER BLOCK MECHANISM AND METHOD OF INSTALLATION 审中-公开
    防止通道和角块块机构及其安装方法

    公开(公告)号:US20110272256A1

    公开(公告)日:2011-11-10

    申请号:US13101697

    申请日:2011-05-05

    IPC分类号: B65G15/60 B23P23/00

    CPC分类号: A63D5/00 Y10T29/49716

    摘要: Components (anti-idling system) for use with a pinspotter system and method of installation is described herein. The anti-idling system includes an anti-idling channel provided underneath a pit conveyor belt adjacent a rear roller of the pit conveyor belt and an elevator system of a pinspotter assembly. The anti-idling channel has a fastening mechanism structured to attach the anti-idling channel to a sidewall of the pinspotter assembly.

    摘要翻译: 本发明描述了与排压系统一起使用的部件(防怠速系统)和安装方法。 防怠速系统包括设置在凹坑传送带下面的与凹坑传送带的后辊相邻的防怠速通道和排压组件的电梯系统。 防窜动通道具有紧固机构,其被构造成将防窜动通道连接到排压组件的侧壁。