DATA MANAGEMENT SYSTEM, MANAGEMENT METHOD, AND STORAGE MEDIUM

    公开(公告)号:US20230074990A1

    公开(公告)日:2023-03-09

    申请号:US17794599

    申请日:2021-02-15

    IPC分类号: G06F16/21

    摘要: A management system of the present invention includes a design database storing member identification information, member coordinates, and member shapes of construction members constituting a construction object, a management member selecting unit configured to select a management member to be managed among the construction members stored in the design database, a related member selecting unit configured to select a related member adjacent to the management member from the design database, a boundary information creating unit configured to select an adjacent portion between the management member and the related member, and with respect to the adjacent portion, as boundary information, associate identification information, adjacent portion coordinates, an adjacent portion shape of the adjacent portion, member identification information of the management member, and member identification information of the related member with each other, and a comparison result database configured to store information associated by the boundary information creating unit.

    DATA MANAGEMENT SYSTEM, MANAGEMENT METHOD, AND STORAGE MEDIUM

    公开(公告)号:US20230045338A1

    公开(公告)日:2023-02-09

    申请号:US17793881

    申请日:2021-01-28

    IPC分类号: G06F16/21 G06Q50/08

    摘要: The present management system includes a design database recording member identification information and member shape information on construction members constituting a construction object, a measurement database recording point coordinates of measurement points of the construction object, a member shape information acquiring unit configured to acquire the member shape information of a shape calculation member selected among the construction members recorded in the design database, a member in-range determining unit configured to determine whether coordinates of an object point selected among the measurement points recorded in the measurement database are of the shape calculation member by using the member shape information of the shape calculation member, and an allocated measurement data creating unit configured to record the object point in association with member identification information of the shape calculation member in the measurement database.

    DATA MANAGEMENT SYSTEM, MANAGEMENT METHOD, AND STORAGE MEDIUM

    公开(公告)号:US20220414066A1

    公开(公告)日:2022-12-29

    申请号:US17780811

    申请日:2020-11-27

    IPC分类号: G06F16/21 G06F16/25

    摘要: Data management to reflect an actual construction status in design is realized. In order to achieve the object, a management system includes a design database recording, with respect to members of a construction object, design data of at least member IDs, member coordinates, member shapes, a measurement database recording measurement data of the construction object, a starting point member selecting unit configured to select a starting point member from the design database, a measurement information selecting unit configured to select the measurement data corresponding to the starting point member from the measurement database, and an actual status model creating unit configured to create an actual status model with respect to the starting point member by performing shape correction of a design model of the starting point member created from the design database by using the measurement data.

    DATA MANAGEMENT SYSTEM, MANAGEMENT METHOD, AND STORAGE MEDIUM

    公开(公告)号:US20230015599A1

    公开(公告)日:2023-01-19

    申请号:US17783215

    申请日:2020-11-27

    IPC分类号: G06F30/12 G06Q50/08 G06F30/13

    摘要: A management system includes a design database of construction members, a measurement database of the construction members, a construction database recording construction data of the construction members, a construction member selecting unit, a peripheral member selecting unit, a model creating unit configured to create a design model of the construction member and a measurement model of the peripheral member, a corrected model creating unit configured to create a design corrected model by synthesizing the design model and the measurement model, and a corrected construction plan creating unit configured to select a construction designated member based on the design corrected model, and record, with respect to the construction designated member, coordinates and a shape of the design corrected model as construction designated member coordinates and a construction designated member shape, and construction content of the construction designated member as construction inspection content, in a corrected construction plan database.