-
公开(公告)号:US12098637B2
公开(公告)日:2024-09-24
申请号:US18595263
申请日:2024-03-04
发明人: Guorui Feng , Wei Guo , Tingye Qi , Zhu Li , Jiaqing Cui , Yekai Cui , Jingkai Ma
CPC分类号: E21C41/18 , E21C2100/00 , E21F15/00
摘要: An I-patterned filling method for an initial stage of coal mining based on roof fracture characteristics is provided. A relationship between an overburden load borne by a main roof and an overhang size is determined based on principle of virtual work and a surgery theory when an overhang distance of the main roof reaches an initial weighting interval to enter a plastic limit state with an advance of a working face to obtain the initial weighting interval. An initial fracturing interval of an immediate roof is obtained in the same way. According to a subsidence law of the main roof in an inverted hip roof form, the filling is performed at a key position around an internal plastic hinge line through I-patterned three-strip filling. Size parameters of the I-pattered filling are designed to prevent the immediate roof and the main roof from being fractured.