Rough-cut capacity planning with production constraints and dynamic bottleneck considerations
    1.
    发明申请
    Rough-cut capacity planning with production constraints and dynamic bottleneck considerations 有权
    粗略的能力规划,生产约束和动态瓶颈考虑

    公开(公告)号:US20050114202A1

    公开(公告)日:2005-05-26

    申请号:US10977393

    申请日:2004-10-29

    CPC分类号: G06Q10/06 Y02P90/86

    摘要: To assess the sufficiency of a plurality of machines for processing a number of items, machine availability information indicative of availability of the machines for processing the items, machine capacity information indicative of a capacity of each of the machines for processing the items, and machine preference information indicative of a preference of each of the machines for processing the items are obtained. A capacity constraint, such as an upper limit of items to be processed during a time interval, is determined based on the machine availability information, machine capacity information and machine preference information. At least some of the machines are allocated to process at least some of the items based on the machine availability information, machine capacity information and machine preference information, subject to the capacity constraint. The resulting rough-cut capacity plan may be used to balance available capacity against required capacity.

    摘要翻译: 为了评估用于处理多个物品的多个机器的充足性,指示用于处理物品的机器的可用性的机器可用性信息,指示用于处理物品的每个机器的容量的机器容量信息和机器偏好 获得指示用于处理物品的每个机器的偏好的信息。 基于机器可用性信息,机器容量信息和机器偏好信息来确定诸如在时间间隔期间处理的项目的上限的容量约束。 根据容量约束,至少部分机器被分配以基于机器可用性信息,机器容量信息和机器偏好信息来处理至少一些项目。 所产生的粗切容量计划可用于平衡可用容量与所需容量。

    Job release with multiple constraints
    2.
    发明申请
    Job release with multiple constraints 有权
    作业释放有多个约束

    公开(公告)号:US20050096770A1

    公开(公告)日:2005-05-05

    申请号:US10979069

    申请日:2004-11-01

    摘要: To schedule the release of jobs from a pool of pending jobs, machine information and information about items to be processed are used to determine available machine capacity. Available machine capacity is allocated to jobs subject to multiple job release constraints. Allocation may be performed first for any pending jobs which were partially released during a previous time interval, and then to new jobs in decreasing order of determined job rank. If different operative constraints dictate different numbers of units of a job to be released, the minimum number of units meeting each constraint may be released. After the number of units to be released has been determined for a job, machine information is updated to account for available capacity consumed by the release of the selected number of units of the job. Updated information may be used for job release scheduling of the next job.

    摘要翻译: 要计划从待处理作业池中释放作业,将使用机器信息和有关要处理的项目的信息来确定可用的机器容量。 可用的机器容量分配给受到多个作业发布约束的作业。 可以首先对先前时间间隔内部分释放的待处理作业进行分配,然后按确定的作业等级降序排列新作业。 如果不同的操作限制规定要释放的作业的单位数量不同,则可以释放满足每个约束的最小单位数。 在为作业确定要发布的单位数量之后,更新机器信息以考虑释放所选择的作业单元数量所消耗的可用容量。 更新的信息可用于下一个作业的作业发布调度。