公开(公告)号:US20210109690A1
公开(公告)日:2021-04-15
申请号:US17046238
申请日:2019-04-08
Applicant: VIDEOJET TECHNOLOGIES INC.
Inventor: Robert V. Weaver , Robert K. Neagle , Randy Fischer
Abstract: A method and system for operating an industrial printer includes obtaining initial data that indicates the industrial printer used on a production line at a facility and a product to be output. Target data is obtained indicating target start time and target number of the product and target duration. The industrial printer is operated to report a count of print operations for the product at regular time intervals. Actual data is stored indicating the count and the time interval. Upon a condition, a line report is determined based on the count and the target data. The line report is presented on a display device. The condition is one or more of passage of the target duration after the target start time, passage of the target duration after a first print operation, a change in shift workers on the production line, a time of day, and a predetermined event.
-
公开(公告)号:US11836397B2
公开(公告)日:2023-12-05
申请号:US17046238
申请日:2019-04-08
Applicant: VIDEOJET TECHNOLOGIES INC.
Inventor: Robert V. Weaver , Robert K. Neagle , Randy Fischer
IPC: G06F3/12
CPC classification number: G06F3/1207 , G06F3/1229 , G06F3/1259 , G06F3/1282
Abstract: A method and system for operating an industrial printer includes obtaining initial data that indicates the industrial printer used on a production line at a facility and a product to be output. Target data is obtained indicating target start time and target number of the product and target duration. The industrial printer is operated to report a count of print operations for the product at regular time intervals. Actual data is stored indicating the count and the time interval. Upon a condition, a line report is determined based on the count and the target data. The line report is presented on a display device. The condition is one or more of passage of the target duration after the target start time, passage of the target duration after a first print operation, a change in shift workers on the production line, a time of day, and a predetermined event.
-