公开(公告)号:US20230265533A1
公开(公告)日:2023-08-24
申请号:US17922663
申请日:2021-03-29
发明人: Yongli XIAO , Yongqian LI
IPC分类号: C21B3/08
CPC分类号: C21B3/08 , C21B2400/024 , C21B2400/056 , C21B2400/066
摘要: The present application provides an efficient treatment method and apparatus for multiphase steel slag. According to the present application, the treatment apparatus for multiphase steel slag comprises a steel slag feeding apparatus and a drum for treating steel slag, and the steel slag feeding apparatus comprises a feeding chute; the treatment apparatus for multiphase steel slag further comprises a storage compartment disposed between the feeding chute and the drum; the storage compartment is an open cylinder, and has one end forming a working fit with the lower open end of the feeding chute and the other end being fixedly connected to and coaxial with the treatment cavity of the drum. By means of the storage compartment obliquely placed between the front of the drum and the feeding chute and used for buffering and transition, there is no need to use a slag raking apparatus, and safe technological treatment of various steel slag by a drum is implemented.
-
公开(公告)号:US20240229170A9
公开(公告)日:2024-07-11
申请号:US18279605
申请日:2022-03-01
申请人: TRUYOINS S.R.L.
发明人: Franco CARLESSO , Edoardo PIZZATO
IPC分类号: C21B3/08
CPC分类号: C21B3/08 , C21B2400/024 , C21B2400/026 , C21B2400/056
摘要: A method for the treatment of black slag, which contains lime (CaO) or lime-based compounds, and which is generated in an electric furnace that produces steel from scrap, includes indirectly cooling the black slag immediately after the black slag exits from the electric furnace or after collection of the black slag in a cauldron, for a period of time between about 10 minutes and about 45 minutes.
-
公开(公告)号:US20240132980A1
公开(公告)日:2024-04-25
申请号:US18279605
申请日:2022-03-01
申请人: TRUYOINS S.R.L.
发明人: Franco CARLESSO , Edoardo PIZZATO
IPC分类号: C21B3/08
CPC分类号: C21B3/08 , C21B2400/024 , C21B2400/026 , C21B2400/056
摘要: A method for the treatment of black slag, which contains lime (CaO) or lime-based compounds, and which is generated in an electric furnace that produces steel from scrap, includes indirectly cooling the black slag immediately after the black slag exits from the electric furnace or after collection of the black slag in a cauldron, for a period of time between about 10 minutes and about 45 minutes.
-
公开(公告)号:US20230295754A1
公开(公告)日:2023-09-21
申请号:US18018677
申请日:2021-06-21
发明人: Yongli XIAO , Yongqian LI
IPC分类号: C21B3/08
CPC分类号: C21B3/08 , C21B2400/026 , C21B2400/064 , C21B2400/056
摘要: An integrated drying process and device for dry granulated slag and sludge. The process comprises the following steps: 1) slag ball mixing and soaking: high-temperature slag and steel balls are fully mixed and exchange heat therebetween, the high-temperature slag is cooled because the heat thereof is quickly absorbed by the steel balls and is crushed to form granular slag, and the temperature of the steel balls rises because the steel balls absorb the heat of the high-temperature slag; and 2) sludge drying: the high-temperature steel balls are conveyed to a sludge drying device to be mixed with injected sludge, the sludge is dried, the steel balls are separated from the sludge when the water content of the sludge reaches a set value, and the steel balls and the sludge are separately discharged. In the present invention, high-temperature slag waste heat is used for heating steel balls, and sludge is dried by means of the heated steel balls, thus achieving the cooperative treatment of slag cooling, granulation and sludge drying, solving two difficult problems of slag cooling and sludge drying, and greatly increasing the waste heat recycling rate of high-temperature slag.
-
5.
公开(公告)号:US20230151446A1
公开(公告)日:2023-05-18
申请号:US17916593
申请日:2021-04-01
CPC分类号: C21B3/08 , C22B7/04 , F28F5/02 , F28D7/1607 , C21B2400/024 , C21B2400/054 , C21B2400/056 , F28D2021/0022
摘要: A plant for the treatment and recovery of white slag resulting from steelmaking processes. The plant including at least one basic frame; at least one work chamber, movable in rotation around a relevant axis and configured to receive and treat the white slag, the latter being moved forward along at least one direction of treatment. The work chamber including at least one loading portion through which said white slag is loaded; at least one cooling portion arranged downstream of said loading portion and comprising at least one treatment channel of said white slag; and cooling device/structure/component/or the like comprising at least one coolant to cool said white slag to obtain at least one recovery powder; and at least one sorting and separation portion of the recovery powder arranged.
-
-
-
-