A METHOD FOR PULLING A CASING AND A WELL INTERVENTION TOOLSTRING THEREFOR

    公开(公告)号:WO2022197189A1

    公开(公告)日:2022-09-22

    申请号:PCT/NO2022/050070

    申请日:2022-03-21

    Abstract: 1. A method for pulling a casing, comprising the steps of: - assembling a toolstring of - a drill pipe string, - a through bore cutter tool (20), - a swivel (30) below the cutter tool (20), - a swab cup wash tool (40), - a perforation gun (50). - run in hole and place the perforation gun (50) at a predetermined perforation depth, - perforate the casing using the perforation gun (50), - wash the perforated casing annulus using the swab cup wash tool (40), - circulate in cement into the washed casing annulus and the casing bore using the swab cup wash tool (40), - wait on cement and pressure test the cement plug so formed, - pull up and cut casing at a shallower depth using said casing cutter tool (20), - test pull the severed-off casing section using a spear tool (10), - If test pull successful, pull up and remove said spear tool (10), said cutter tool (20) and said wash tool (40) - reinsert said spear tool (10) and run in to engage the severed-off casing section, and pull said severed casing section out of hole.

    CASING CUTTER TOOL AND METHOD FOR OPERATING THE CASING CUTTER

    公开(公告)号:WO2021040531A1

    公开(公告)日:2021-03-04

    申请号:PCT/NO2020/050215

    申请日:2020-08-27

    Abstract: The invention is a drill pipe string (10) - conveyed casing cutter tool comprising - a cylindrical main body (0) with casing cutter knife arms (3) rotatable on pivot axles (31) and provided with rotating cogs (32) in a first end of said knife arms (3), said knife arms (3) retractable into recesses (01) in said main body (0), - a spring (2) -loaded piston sleeve (4) with central bore (40) axially arranged in the main body (0), - said cogs (32) engaged with a corresponding linear cog array (41) on said piston sleeve (4) and arranged for extending said knife arms (0) with a cutting edge (33) out of said recess (01). - The piston sleeve (4) is provided with a ball valve (6), - said ball valve (6) is actuated by a motor (11) controlled by a control module (1) so as for shutting said central bore (40), - so as for when said ball valve is closed and pressure set from surface through said drill pipe string (10), said piston will move and actuate said knife arms (3) to a cutting position, for rotation cutting an inner wall of a casing when said drill pipe string (10) is rotated.

    TANDEM RELEASABLE BRIDGE PLUG SYSTEM AND METHOD FOR SETTING SUCH TANDEM RELEASABLE BRIDGE PLUGS
    3.
    发明申请
    TANDEM RELEASABLE BRIDGE PLUG SYSTEM AND METHOD FOR SETTING SUCH TANDEM RELEASABLE BRIDGE PLUGS 审中-公开
    TANDEM RELEASABLE BRIDGE PLUG SYSTEM AND METHOD OF SETTING THE TANDEM RELEASABLE BRIDGE PLUGS

    公开(公告)号:WO2018052308A1

    公开(公告)日:2018-03-22

    申请号:PCT/NO2017/050223

    申请日:2017-09-13

    CPC classification number: E21B33/122 E21B23/06

    Abstract: A method of setting a tandem releasable bridge plug system in a casing (0), comprising the steps of: • assembling a tandem bridge plug string (1L,1U) comprising: • a lower bridge plug (1L) on a lower, disconnectable connector (2L), • an upper bridge plug (1U) on an upper, disconnectable connector (2U) which both are initially disabled by a lock (5) and unlockable from topsides, and • running in the tandem plug string (1L,1U) on a drill pipe string (4) until the lower plug (1L) is at its setting target depth (dL_); • setting and shutting the lower plug (1L); • disconnecting the upper plug (1U) from the lower plug (1L); • pulling up the upper plug (1U) to its upper setting target depth (dU) • enabling the upper plug (1U) by releasing the lock (5); • setting and shutting the upper plug (1U); • disconnecting the drill pipe string (4) from the upper plug (1U).

    Abstract translation: 一种在壳体(0)中设置串联可释放桥塞系统的方法,包括以下步骤:·组装串联桥塞柱(1L,1U),所述串联桥塞柱(1L,1U)包括:·下桥塞 1L)安装在可拆卸的下部连接器(2L)上•上部可拆卸连接器(2U)上的上部桥塞(1U),两者最初均由锁(5)禁用且可从上部解锁,以及•在 (4)上的串联插塞串(1L,1U),直到下插塞(1L)处于其设定目标深度(dL_); •设置并关闭下部插头(1L); •断开上插头(1U)与下插头(1L)的连接; •将上部插头(1U)拉至其上限设定目标深度(dU)•通过释放锁(5)启用上部插头(1U); •设置并关闭上部插头(1U); •将钻杆柱(4)从上部插头(1U)上拔下。

    A METHOD FOR CUTTING OFF A TUBULAR IN A SUBTERRANEAN WELL AND REMOVING THE CUT-OFF SECTION OF THE TUBULAR FROM THE WELL

    公开(公告)号:WO2021262011A1

    公开(公告)日:2021-12-30

    申请号:PCT/NO2021/050156

    申请日:2021-06-25

    Abstract: A method for cutting off a tubular in a subterranean well and removing a cut-off section of said tubular from the subterranean well, wherein the method comprises: - providing a downhole tool assembly (10) on a work string (20) wherein a through-bore (19) extends through said work string (20) and said tool assembly (10), the tool assembly (10) comprising, from top to bottom: - a pull tool (14), - an anchor tool (11) for anchoring the pull tool (14) to a first tubular (1), - a space-out drill pipe string (21), - a spear tool (12) for anchoring the pull tool (14) to a second tubular (2), at least partially surrounded by the first tubular (1), - a packer tool (15), - a valve tool (16) for controlling fluid communication in the through-bore (19), wherein a first fluid conduit (161) extends between the valve tool (16) and the packer tool (15), - a cutter tool (13) for cutting said second tubular (2), - running the tool string into the desired portion of the second casing, cutting, pulling and releasing the anchor tool (11) - pulling the entire tool assembly (10) with the cut-off section of the second tubular (2) out of the well.

    A CASING ANNULUS CEMENT FOUNDATION SYSTEM AND A METHOD FOR FORMING A FLANGE COLLAR CONSTITUTING A CEMENT FOUNDATION
    6.
    发明申请
    A CASING ANNULUS CEMENT FOUNDATION SYSTEM AND A METHOD FOR FORMING A FLANGE COLLAR CONSTITUTING A CEMENT FOUNDATION 审中-公开
    一种铸造水泥基础系统和一种形成法兰克朗组合水泥基金会的方法

    公开(公告)号:WO2016118018A1

    公开(公告)日:2016-07-28

    申请号:PCT/NO2015/050226

    申请日:2015-11-26

    Abstract: A method for forming a flange collar constituting a cement foundation in a casing annulus, comprising the steps of: installing a casing section (1) comprising an internal sleeve (2) axially displaceable by a conveyed tool (3) for opening a casing cementing outlet (12); said internal sleeve (2) connected through radial bolts (4) through axial - parallel slots (41) through the casing wall to a casing -external sleeve (5), said casing -external sleeve (5) abutting against a first edge (61) of a deformable metal sleeve (6) having its opposite, second end abutting axially against a radial shoulder (32) on the casing section (1); using said drill pipe conveyed tool (3) for axially displacing said internal sleeve (2) thus forcing said external sleeve (5) to deforming said metal sleeve (6) to a radially extending flange collar (6F) radially extending across said casing annulus, ejecting cement via said casing cementing outlet (12) to said annulus, allowing said cement to distribute above said formed radially extending flange collar (6F), and allowing said cement to settle in said annulus.

    Abstract translation: 一种用于形成在壳体环空中构成水泥基础的凸缘轴环的方法,包括以下步骤:安装包括内部套筒(2)的壳体部分(1),所述内部套筒(2)可被输送的工具(3)轴向移动,用于打开壳体固井出口 (12); 所述内套筒(2)通过径向螺栓(4)通过轴向平行的槽(41)穿过套管壁连接到套管 - 外套筒(5),所述套管 - 外套筒(5)抵靠第一边缘 的可变形金属套筒(6),其具有相对的第二端部,其轴向抵靠在所述壳体部分(1)上的径向肩部(32)上; 使用所述钻杆输送工具(3)来轴向移动所述内部套筒(2),从而迫使所述外部套筒(5)将所述金属套筒(6)变形成径向延伸穿过所述壳体环的径向延伸的凸缘轴环(6F) 通过所述壳体固井出口(12)将水泥喷射到所述环形空间,允许所述水泥分布在所述形成的径向延伸的凸缘轴环(6F)上方,并允许所述水泥沉降在所述环空中。

    AXIAL POSITION-CONTROLLED OPERATION TOOLSTRING AND METHOD

    公开(公告)号:WO2022231438A1

    公开(公告)日:2022-11-03

    申请号:PCT/NO2022/050102

    申请日:2022-05-02

    Abstract: The invention relates to an axial position-controlled operation toolstring (1) for conducting an axial position-controlled operation in a well. The toolstring (1)comprising from below and up: - a casing cutter tool (20) comprising knives (22); 5 - a tag sub (50) with dogs (52) arranged for landing on a protrusion (90) in said well; - a pipe spear (60); - a drill pipe string (80), wherein said knives (22) of said casing cutter tool (20) are spaced out a predetermined initial distance (L) below the dogs (52) of the tag sub (50); and 0 wherein said dogs (52) are arranged for being collapsible by weight loading against said protrusion (90). The invention also relates to a method wherein said toolstring (1) is used.

    DRILL PIPE STRING CONVEYED BALL VALVE TOOL
    8.
    发明申请

    公开(公告)号:WO2022186702A1

    公开(公告)日:2022-09-09

    申请号:PCT/NO2022/050059

    申请日:2022-03-02

    Abstract: The invention is a drill pipe string conveyed ball valve tool (10) comprising: - a mandrel (101, 201) with a through bore (102, 202) connectable to said drill pipe string, - an axially stroking piston (103, 203) and piston rod (104, 204) having an axial through bore (105, 205), arranged in said through bore (102, 202), - said axially stroking piston rod (104, 204) mechanically controlling - an auxiliary ball valve element (106, 206) having a full main bore and a restricted transverse bore (109, 209), - said piston rod (104, 204) having - an initial stroke length (L0) arranged for allowing fully open said auxiliary ball valve elements (106, 206), - a first stroke length (L1) arranged for allowing said auxiliary ball valve element (106) to turn said restricted transverse bore (109) into the flow path of said central bore (105).

    IMPROVED TANDEM RELEASABLE BRIDGE PLUG SYSTEM AND METHOD FOR SETTING SUCH TANDEM RELEASABLE PLUGS

    公开(公告)号:WO2019177466A1

    公开(公告)日:2019-09-19

    申请号:PCT/NO2019/050056

    申请日:2019-03-13

    Abstract: A method of setting a tandem releasable bridge plug system in a casing (0), comprising: - assembling a tandem bridge plug string (1L,1U) comprising from bottom to top: - a lower bridge plug (1L) on a lower, disconnectable connector (2L), - an upper bridge plug (1U) on an upper, disconnectable connector (2U) wherein both the upper bridge plug (1U) and the upper connector (2U) are initially disabled by a lock (5) and unlockable from topsides, and - running in the tandem plug string (1L,1U) on a drill pipe string (4) until the lower plug (1L) is at its setting target depth (dL) in the casing (0); - setting and shutting the lower plug (1L); - disconnecting the upper plug (1U) from the lower plug (1L); - pulling up the upper plug (1U) to its upper setting target depth (dU) in the casing (0), - enabling the upper plug (1U) by releasing the lock (5); - venting annulus gas to a central bore (19U) of the upper plug through a radial aperture (17U) below a packer (14U) of the upper plug (1U) and below a ball valve (18U); - shutting said ball valve (18U) in said central bore (19U) the upper plug (1U); - disconnecting the drill pipe string (4) from the upper plug (1U).

    CEMENTING METHOD ALLOWING INITIAL LINER TOP PRESSURE INTEGRITY CONFIRMATION
    10.
    发明申请
    CEMENTING METHOD ALLOWING INITIAL LINER TOP PRESSURE INTEGRITY CONFIRMATION 审中-公开
    允许初始内衬顶压力完整性确认的开采方法

    公开(公告)号:WO2016060570A1

    公开(公告)日:2016-04-21

    申请号:PCT/NO2015/050190

    申请日:2015-10-14

    CPC classification number: E21B33/14

    Abstract: Cementing takes place after a hanger (38) and seal (39) are set to first insure the pressure integrity of the connection between the string to be cemented and the existing tubular. Cementing top down or bottom up is envisioned with either displaced fluid returning toward the surface in a crossover tool (25-29) or with the displaced fluid squeezed into the formation. A work string manipulates the crossover for reversing out after cementing. For running in a valve assembly (1, 2) is held open to permit circulation. Work string manipulation allows at least one valve that keeps the cement in the annulus to close and at least one other valve to close that keeps the reverse fluid from leaving the cemented tubular to allow such flow to return to the crossover and out to the surface. Valve release can be done with a pressure responsive sleeve instead of a stinger (100) on the running string.

    Abstract translation: 固定装置发生在衣架(38)和密封件(39)被设置为首先确保待接合的绳索与现有管状体之间的连接的压力完整性的情况下。 设想自顶向下或向下倾斜,在交叉工具(25-29)中或移动的流体被挤压到地层中时,设想的流体返回到表面。 工作串操纵混凝土后的交叉换向。 为了在阀组件(1,2)中运行,保持打开以允许循环。 工作串操作允许至少一个将水泥保持在环形空间中的阀门关闭,并且至少一个其他阀门关闭,从而使反向流体不会离开胶合管状体,以允许这种流动返回到交叉并流到表面。 可以使用压力响应套管而不是运行管柱上的托管架(100)来完成阀释放。

Patent Agency Ranking