MANAGING INTERFACES FOR DATAFLOW GRAPHS COMPOSED OF SUB-GRAPHS
    1.
    发明申请
    MANAGING INTERFACES FOR DATAFLOW GRAPHS COMPOSED OF SUB-GRAPHS 审中-公开
    管理组合子图的数据流格局界面

    公开(公告)号:WO2015085152A1

    公开(公告)日:2015-06-11

    申请号:PCT/US2014/068754

    申请日:2014-12-05

    CPC classification number: G06F8/10 G06F8/34

    Abstract: Specifications of dataflow graphs are generated and/or combined. A sub-graph interface (123) of a dataflow graph includes one or more flow junctions. A flow junction (204D) representing a connection between: a flow of data outside the sub-graph interface, and a flow of data inside the sub-graph interface. In some embodiments, information is processed to generate a combined dataflow graph specification (300), including: identifying an association between the sub-graph interface and the first dataflow graph specification, for at least a first flow junction, determining a direction associated with transferring a value of a descriptor, and transferring a value of a descriptor according to the determined direction. In some embodiments, a link (229) is rendered between the first flow junction and a second flow junction based on user input indicating a relationship between a first descriptor and a second descriptor.

    Abstract translation: 生成和/或组合数据流图的规范。 数据流图的子图界面(123)包括一个或多个流路。 表示在子图界面之外的数据流与子图界面内的数据流的连接的流连接点(204D)。 在一些实施例中,处理信息以生成组合数据流图规范(300),包括:识别子图接口和第一数据流图规范之间的关联,用于至少第一流连接,确定与传送相关联的方向 描述符的值,并根据确定的方向传送描述符的值。 在一些实施例中,基于指示第一描述符和第二描述符之间的关系的用户输入,在第一流连接点和第二流动连接点之间呈现链接(229)。

    DEBUGGING A GRAPH
    2.
    发明申请
    DEBUGGING A GRAPH 审中-公开
    调查图

    公开(公告)号:WO2016073746A1

    公开(公告)日:2016-05-12

    申请号:PCT/US2015/059280

    申请日:2015-11-05

    CPC classification number: G06F11/3636 G06F8/34 G06F8/41 G06F17/30398

    Abstract: In certain aspects, a method includes: receiving a first graph that includes components and flows, the components representing operations performed on data records, the flows representing flows of data records between components; receiving a specification that is separate from the first graph, the specification defining one or more insertions, each of the insertions associated with a flow of the first graph; generating one or more components that each corresponds to one of the insertions; and generating a second graph that includes components and flows that correspond to at least some of the components and flows of the first graph and the one or more generated components.

    Abstract translation: 在某些方面,一种方法包括:接收包括组件和流的第一图形,表示对数据记录执行的操作的组件,表示组件之间的数据记录流的流; 接收与第一图分离的规范,该规范定义一个或多个插入,每个插入与第一图的流相关联; 产生每个对应于一个插入的一个或多个组件; 以及生成第二图形,其包括与第一图形和所述一个或多个生成的组件的至少一些组件和流程对应的组件和流程。

Patent Agency Ranking