Abstract:
In an offshore system having a floating vessel, a turret within a hull opening, and a bearing assembly including a support row assembly axially transferring the weight of the turret to the vessel and allowing the vessel to weather vane about the turret, a method and arrangement for in situ remediation of a damaged support row assembly. An outer upper ring is removed from an outer lower ring and a support ring is installed on the outer lower ring. A lower race and support rollers of a remedial support row assembly are installed on the support ring. A reaction ring is positioned above the support ring and connected to an inner ring secured to the turret. The inner ring is axially displaced relative to the outer lower ring and the turret axial loading is transferred to the remedial support row assembly between the support ring and the reaction ring.
Abstract:
Disclosed embodiments relate to systems and methods for mating a wind turbine off-shore to a spar buoy without the use of a crane barge. The system may include a spar buoy, wherein the spar buoy is secured to a foundation, and a wind turbine to be installed on the spar buoy. The system may also include a first truss affixed to the top of the spar buoy and a second truss affixed to the bottom of the wind turbine. The first truss may comprise either stabbings or receptacles configured for mating to the second truss and the second truss may comprise either receptacles or stabbings configured for mating to the first truss.