-
公开(公告)号:WO1998010675A1
公开(公告)日:1998-03-19
申请号:PCT/US1997016085
申请日:1997-09-11
Applicant: TEXTRON, INC.
Inventor: TEXTRON, INC. , RIPLEY, Richard, E.
IPC: A44C05/02
CPC classification number: A44C5/02
Abstract: A top shell (84) for use on a link of a flexible linkage (82), the top shell (84) comprising a molded body having a top portion with a top surface and a bottom portion defining an underside. The underside includes a recess into which is disposed a decorative material (86) that is visible from the top surface. The top portion defines a lens that refracts incident light on the top surface to the decorative material to form an image associated with the decorative material.
Abstract translation: 一种用于柔性连杆机构(82)的连杆上的顶壳(84),所述顶壳(84)包括具有顶部的模制体,所述顶部具有顶部表面和限定下侧的底部。 下侧包括凹部,凹部设置有从顶表面可见的装饰材料(86)。 顶部限定了将顶表面上的入射光折射到装饰材料以形成与装饰材料相关联的图像的透镜。
-
公开(公告)号:WO1987001060A1
公开(公告)日:1987-02-26
申请号:PCT/US1986001703
申请日:1986-08-15
Applicant: TEXTRON, INC.
Inventor: TEXTRON, INC. , MATUSCHEK, Josip
IPC: B21J05/02
CPC classification number: B21J15/02 , F16B19/06 , Y10T29/49915 , Y10T29/49956 , Y10T29/49972 , Y10T403/49 , Y10T403/7123 , Y10T403/75
Abstract: A rivet (10) installation method creates a preload on the workpieces (18, 20) being joined. The rivet shank (12) is urged to resist compression during installation while a ring (30) on the end of the shank is compressed against the workpieces (18, 20). Withdrawing the compression releases the shank to provide the preload.
Abstract translation: 铆钉(10)安装方法在正在接合的工件(18,20)上产生预载荷。 在安装过程中,迫使铆钉柄(12)抵抗压缩,同时将柄的端部上的环(30)压靠在工件(18,20)上。 拉伸压缩释放柄以提供预压。
-