Apparatus, system and method for power saving between a scheduling request and grant using self-learning
Abstract:
A device and method for power saving between a scheduling request and a grant. A user equipment (UE) establishes a connection to a network, the UE and the network may be configured with a Connected Discontinuous Reception (C-DRX) functionality, the C-DRX functionality including a cycle with at least one onDuration. The UE transmits, during a first subframe a scheduling request (SR) to the network, the SR corresponds to data that is to be transmitted by the UE. The UE determines a second subframe for the UE to enter an active mode of processing for a reception of a grant, the second subframe is subsequent to the first subframe and prior to a next onDuration. The UE initiates an active mode of processing for the reception of the grant during the second subframe.
Information query
Patent Agency Ranking
0/0