Invention Grant
- Patent Title: Multistage oilfield design optimization under uncertainty
-
Application No.: US15109671Application Date: 2015-01-06
-
Publication No.: US10767448B2Publication Date: 2020-09-08
- Inventor: Hugues A. Djikpesse , Kashif Rashid , William J. Bailey , Michael David Prange , Benoit Couet
- Applicant: Schlumberger Technology Corporation
- Applicant Address: US TX Sugar Land
- Assignee: Schlumberger Technology Corporation
- Current Assignee: Schlumberger Technology Corporation
- Current Assignee Address: US TX Sugar Land
- Agent Cathy Hewitt
- International Application: PCT/US2015/010242 WO 20150106
- International Announcement: WO2015/103582 WO 20150709
- Main IPC: G06G7/48
- IPC: G06G7/48 ; E21B41/00 ; E21B43/00 ; G06Q10/06 ; G06F30/20 ; E21B43/26 ; E21B43/267 ; E21B47/00 ; E21B49/00 ; G05B13/04 ; G06Q50/02 ; G06G7/50 ; G06N3/04 ; H04W16/12 ; G06F30/00 ; G06F111/06

Abstract:
Managing oilfield operations include obtaining a subsurface model including a fracture design model having an fracture property with an uncertain value. A set of representative values that represent uncertainty in the fracture property is obtained and used to solve an oilfield optimization problem with a control variable to obtain a solution. The solution includes an optimal value for the control variable. Based on the solution, an oilfield design is generated and stored.
Public/Granted literature
- US20160326845A1 Multistage Oilfield Design Optimization Under Uncertainty Public/Granted day:2016-11-10
Information query