- 专利标题: Systems and methods for hybrid dynamic state estimation
-
申请号: US16596093申请日: 2019-10-08
-
公开(公告)号: US11119462B2公开(公告)日: 2021-09-14
- 发明人: Renchang Dai , Guangyi Liu , Chen Yuan , Peng Wei , Yongli Zhu , Yi Lu , Zhijun Liao , Zhiwei Wang
- 申请人: Renchang Dai , Guangyi Liu , Chen Yuan , Peng Wei , Yongli Zhu , Yi Lu , Zhijun Liao , Zhiwei Wang
- 申请人地址: US WA Sammamish; US CA San Jose; US CA San Jose; US CA San Jose; US CA San Jose; CN Chengdu; CN Nanchang; US CA Cupertino
- 专利权人: Renchang Dai,Guangyi Liu,Chen Yuan,Peng Wei,Yongli Zhu,Yi Lu,Zhijun Liao,Zhiwei Wang
- 当前专利权人: Renchang Dai,Guangyi Liu,Chen Yuan,Peng Wei,Yongli Zhu,Yi Lu,Zhijun Liao,Zhiwei Wang
- 当前专利权人地址: US WA Sammamish; US CA San Jose; US CA San Jose; US CA San Jose; US CA San Jose; CN Chengdu; CN Nanchang; US CA Cupertino
- 代理机构: PowerPatent
- 代理商 Bao Tran
- 主分类号: G05B99/00
- IPC分类号: G05B99/00 ; G05B19/042
摘要:
A power system energy management system with dynamic state estimation (DSE) is disclosed wherein system dynamic states are estimated using SCADA measurements, PMU measurements, signals of controllers, digital recorders, protection devices, and smart electronic devices. The DSE is solved first by Unscented Kalman Filter, and if the Unscented Kalman Filter is failed, weighted lease square is used to solve the DSE. If weighted lease square is failed, integration method is used to calculate the dynamic states. In another aspect, Unscented Kalman Filter, weighted lease square, and integration calculation are applied to solve the DSE by nodal parallel computing for each generation system.
公开/授权文献
- US20210103263A1 SYSTEMS AND METHODS FOR HYBRID DYNAMIC STATE ESTIMATION 公开/授权日:2021-04-08
信息查询