METHOD AND SYSTEM FOR IMPLEMENTING MINI-SLOT SCHEDULING FOR ALL UEs THAT ONLY ARE ENABLED TO LOWER POWER USAGE
Abstract:
Systems and methods are provided for adaptive mini-slot management in a network, including an element management control unit comprising a set of distribution and central units (DU/CU) to monitor power and channel traffic at a plurality of cell sites in the network; a scheduler unit for user equipment (UE) to enable and disable a set of mini-slots in a downlink (DL) pattern and an uplink (UL) pattern including at least two concatenated patterns jointly repeated with periodicity in a slot configuration period for new radio (NR) communications by users at cell sites in the network; and in response to a request by a user, the scheduler unit reserves a number of mini-slots for use in each slot configuration period wherein a reserved slot number is responsive to at least one of a condition of an AC power outage, and reduced channel traffic based on data received by the DU/CU about the condition.
Information query
Patent Agency Ranking
0/0