摘要:
To improve safety and comfort, the present invention is an ultra large marine floating system with a length L of 350 to 550 m, a width W of 45 to 80 m, and a depth D of 25 to 35 m, wherein the ultra large marine floating system has a tank zone Z2 and a plant zone Z1 separated from each other in a plane view, the tank zone Z2 having LNG storage tanks Z21, Z22 arranged in a hold, the plant zone Z1 including a liquefied natural gas plant 12.
摘要:
The invention relates to a floating platform having improved operating conditions. The invention comprises a floating structure including a single central floating body (1) having a longitudinally elongate configuration, the lower portion of said central body (1) being intended to remain submerged. In addition, the invention comprises: a base (3) located in the lower portion of the central body (1) in order to support at least one wind generator (5); and at least four feet (2) located in the lower portion of the central body (1) and provided with (a) a first end, by means of which they are solidly connected to the central body (1), (b) a second end, opposite the first end, disposed at a greater distance from the central body (1), and (c) at least one portico (6) located at the second end of each foot (2), each portico (6) comprising a first longitudinal perforation (12) for anchoring the floating platform to the seabed (5).
摘要:
Verfahren zum Installieren einer voll funktionstüchtigen, ein schwimmendes Fundament (20) aufweisenden Offshore-Windenergieanlage (10), mit den Schritten: a. Verlegen eines Seekabels (120) zu einem vorbestimmten Ort, an dem die Offshore-Windenergieanlage (10) installiert werden soll, b. Verankern wenigstens eines Verankerungsmittels (110) am vorbestimmten Ort und Verbinden des Verankerungsmittels (110) mit einem Schwimmkörper (100), c. Transportieren der schwimmenden Offshore-Windenergieanlage (10) zum vorbestimmten Ort, d. Verbinden des Schwimmkörpers (100) oder des Verankerungsmittels (110) und des Seekabels (120) mit der schwimmenden Offshore-Windenergieanlage (10), und e. Absenken der mit dem Schwimmkörper (100) oder mit dem Verankerungsmittel (110) und dem Seekabel (120) verbundenen Offshore-Windenergieanlage (10) durch Fluten des schwimmenden Fundaments (20), wobei die Schritte c), d) und e) in der Reihenfolge c-d-e, c-e-d oder e-c-d vorgenommen werden.
摘要:
A system and method comprising a first, second and third hull. An arm extending from the first hull to the second hull where the arm is coupled to a power take off module in the second hull for transferring relative motion between the second hull and the arm into electrical energy. A second arm extending from the second hull to the third hull. The second arm coupled to another power take off device in the third hull for transferring relative motion between the third hull and the second arm into electrical energy.
摘要:
A mooring assembly includes: a mooring buoy having a central axis, an upper ring portion providing an upper abutment surface; a mooring structure including a cavity with a wall receiving the mooring buoy; and a buoy locking system near the cavity engaging with the upper ring portion for locking the mooring buoy to the turret mooring structure and including at least two locking devices attached to the mooring structure, each locking device having a locking dog connected to a force member for axial displacement and exerting an upward force on the upper abutment surface. The mooring buoy includes a lower abutment surface. The locking system includes an engagement member below the locking dog, engaging with the lower abutment surface and exerting a downward force. The buoy at positions axially above the upper abutment surface situated at an axial clearance from the cavity wall.