摘要:
A lifting device (20) for installing lightweight prefabricated elements (21) in place on a wall or ceiling of a building. The lifting device comprises an intermediate storage (37) for the lightweight prefabricated elements and a lifting unit (22) provided with a gripping means (23, 36) for transferring the lightweight prefabricated elements from the intermediate storage to the installation site. According to the invention, the lifting device equipped with the intermediate storage incorporates at least one work station (26) for the installer (35) installing the lightweight element (21) in place. When there are two work stations (26a, 26b), the first work station (26a) is intended for the installer (35a) installing the first end of the lightweight prefabricated element (21) in place, and the second work station (26b) for the installer (35b) installing the opposite end of the lightweight prefabricated element in place. In a most preferred embodiment, the work stations (26a, 26b) are connected to turning booms (25a, 25b), which are mounted on the frame (24) of the lifting device so that the work stations are movable in both vertical and lateral directions.
摘要:
A method for installing light-weight panels, according to which method the light-weight panel is mounted in its place on the wall or ceiling of a building and fastened there by a fastening member resting on or attachable to the edge portion of the light-weight panel. The light-weight panel installation apparatus incorporates a fastening device, such as a nail gun, by means of which the fastening member, resting on or attached to the edge of the light-weight panel, is fastened to a building frame. The panel fastening member incorporates a part resting on the edge of the light-weight panel, which part can, directly or by means of an intermediate member, be fastened to a base, such as a building frame.
摘要:
PCT No. PCT/FI95/00145 Sec. 371 Date Nov. 27, 1996 Sec. 102(e) Date Nov. 27, 1996 PCT Filed Mar. 17, 1995 PCT Pub. No. WO95/25210 PCT Pub. Date Sep. 21, 1995A method for installing light-weight panel units according to which the light-weight panel units are installed on a wall or roof in such a way that at least two panel units at a time are moved to the vicinity of the installation site. After that, the panel units that have been moved are installed in place one by one. The installation device incorporates an intermediate storage unit, in which can be stored at least two light-weight panel units. The intermediate storage unit can be moved during installation to the installation site in the vicinity of a wall or roof and it incorporates equipment which transfers one light-weight panel unit at a time to the installation site.
摘要:
A lifting device (20) for installing lightweight prefabricated elements (21) in place on a wall or ceiling of a building. The lifting device comprises an intermediate storage (37) for the lightweight prefabricated elements and a lifting unit (22) provided with a gripping means (23, 36) for transferring the lightweight prefabricated elements from the intermediate storage to the installation site. According to the invention, the lifting device equipped with the intermediate storage incorporates at least one work station (26) for the installer (35) installing the lightweight element (21) in place. When there are two work stations (26a, 26b), the first work station (26a) is intended for the installer (35a) installing the first end of the lightweight prefabricated element (21) in place, and the second work station (26b) for the installer (35b) installing the opposite end of the lightweight prefabricated element in place. In a most preferred embodiment, the work stations (26a, 26b) are connected to turning booms (25a, 25b), which are mounted on the frame (24) of the lifting device so that the work stations are movable in both vertical and lateral directions.
摘要:
PCT No. PCT/FI95/00145 Sec. 371 Date Nov. 27, 1996 Sec. 102(e) Date Nov. 27, 1996 PCT Filed Mar. 17, 1995 PCT Pub. No. WO95/25210 PCT Pub. Date Sep. 21, 1995A method for installing light-weight panel units according to which the light-weight panel units are installed on a wall or roof in such a way that at least two panel units at a time are moved to the vicinity of the installation site. After that, the panel units that have been moved are installed in place one by one. The installation device incorporates an intermediate storage unit, in which can be stored at least two light-weight panel units. The intermediate storage unit can be moved during installation to the installation site in the vicinity of a wall or roof and it incorporates equipment which transfers one light-weight panel unit at a time to the installation site.