摘要:
In a building having a layer of thermal insulating material, for example mineral wool, the wind stop outside of the insulating material and the steam stop inside the thermal insulating material are united to completely airtight enclose the insulating material. All joints in the stops and between the stops are cemented to provide for airtightness. Both the steam stop (the diffusion stop) and the wind stop are made up by strong tough paper. Jointing tape having thermal cement coating on one side and an electric iron are used for making the airtight joints. The wind stop of the walls and the roof are preferably united to form one single layer for the entire building.
摘要:
An integral airtight layer in the floor, the walls and the roof surrounds the entire useful space of a house or other building. The tightness of the layer is tested before the flooring and inner wall linings are mounted. The airtight layer is made of a diffusion tight material so that it serves as a vapor barrier. The vapor barriers in two stories of the building can be united by a non-diffusion tight layer that encompasses an intermediate floor structure. The resulting building will be practically completely air tight.
摘要:
It is possible to apply lime plaster and lime wash paint according to a predetermined time schedule by watering with carbonated water each time before a layer of plaster or paint is applied. A build-up of plaster or paint can be made one day and another build-up the next day if carbonated water is sprayed onto the surface before the application of the new layer. A plaster surface can be painted already the day after it has been finished and paint thicker than normal can be used so that the number of layers of paint can be reduced. When making a brick structure, for example an arch, with the use of lime mortar, the bricks can be watered with carbonated water before being made in contact with the mortar so that the initial hardening will be faster and the final strength will be greater.
摘要:
It is possible to apply lime plaster and lime wash paint according to a predetermined time schedule by watering with carbonated water each time before a layer of plaster or paint is applied. A build-up of plaster or paint can be made one day and another build-up the next day if carbonated water is sprayed onto the surface before the application of the new layer. A plaster surface can be painted already the day after it has been finished and paint thicker than normal can be used so that the number of layers of paint can be reduced. When making a brick structure, for example an arch, with the use of lime mortar, the bricks can be watered with carbonated water before being made in contact with the mortar so that the initial hardening will be faster and the final strength will be greater.
摘要:
An integral airtight layer (12; 57, 50) in the floor, the walls and the roof surrounds the entire useful space of a house or other building. The tightness of the layer is tested before the flooring and inner wall linings are mounted. The airtight layer is made of a diffusion tight material so that it serves as a vapor barrier. The vapor barriers (57) in two stories of the building can be united by a non-diffusion tight layer (50) that encompasses an intermediate floor structure (51). The resulting building will be practically completely air tight.
摘要:
An integral airtight layer (12; 57, 50) in the floor, the walls and the roof surrounds the entire useful space of a house or other building. The tightness of the layer is tested before the flooring and inner wall linings are mounted. The airtight layer is made of a diffusion tight material so that it serves as a vapor barrier. The vapor barriers (57) in two stories of the building can be united by a non-diffusion tight layer (50) that encompasses an intermediate floor structure (51). The resulting building will be practically completely air tight.
摘要:
In a building having a layer of thermal insulating material, for example mineral wool, the wind stop outside of the insulating material and the steam stop inside the thermal insulating material are united to completely airtight enclose the insulating material. All joints in the stops and between the stops are cemented to provide for airtightness. Both the steam stop (the diffusion stop) and the wind stop are made up by strong tough paper. Jointing tape having thermal cement coating on one side and an electric iron are used for making the airtight joints. The wind stop of the walls and the roof are preferably united to form one single layer for the entire building.