Reinforced steal bridge
    1.
    发明公开
    Reinforced steal bridge 审中-公开
    钢筋桥

    公开(公告)号:EP2011922A3

    公开(公告)日:2009-04-29

    申请号:EP08011929.0

    申请日:2008-07-02

    IPC分类号: E01D19/12 E01D22/00

    CPC分类号: E01D19/125 E01D22/00

    摘要: The present invention relates to a method for arranging a layer on a thin steel floor of a relatively heavily travelled bridge, wherein a glass fibre-reinforced resin layer of epoxy or a similar material is applied to the steel plate and wherein the glass fibre is attached to the steel plate using an adhesive layer.

    Method for arranging/removing a joint and device for covering said joint
    2.
    发明公开
    Method for arranging/removing a joint and device for covering said joint 审中-公开
    一种用于安装/卸除接头和设备,用于覆盖该槽法

    公开(公告)号:EP2000592A1

    公开(公告)日:2008-12-10

    申请号:EP08075543.2

    申请日:2008-06-06

    IPC分类号: E01D19/06 E01D22/00

    CPC分类号: E01D19/06 E01D22/00

    摘要: The present invention relates to a method for arranging or removing a joint in a recess between parts of a road surface, comprising the step of temporarily arranging a cover plate over the recess outside working hours in order to make it possible for traffic to travel over the road surface.
    The invention also relates to a device for covering a joint arranged in a road surface, the device comprising at least one cover plate with a top and bottom side which can be arranged over the joint, and wherein the cover plate comprises dimensions and/or a form such that the joint arranged thereunder remains wholly or to at least considerable extent unloaded.

    摘要翻译: 本发明涉及一种用于布置或在道路表面的多个部分之间的凹部中除去一个接头,其包括在所述凹部暂时布置盖板工作时间以外,以有可能使流量在行进的步骤 路面。 因此本发明涉及一种设备,用于覆盖在道路表面配置的接头,所述设备包括至少一个覆盖板具有顶侧和底侧从而可以在接头被布置,并且worin盖板包括一种尺寸和/或一个 形式的搜索做关节下方布置完全保持或卸载至少相当大的程度。