VERFAHREN ZUM ERMITTELN DES ANSTEUERSTROMS EINES STELLGERÄTS
    2.
    发明授权
    VERFAHREN ZUM ERMITTELN DES ANSTEUERSTROMS EINES STELLGERÄTS 有权
    方法用于确定驱动电流装置停车

    公开(公告)号:EP1651487B1

    公开(公告)日:2007-12-12

    申请号:EP04766348.9

    申请日:2004-07-28

    IPC分类号: B60T8/36 B60T8/50

    摘要: The invention relates to a method for the calibration or mechanical adjustment, or calculation of a drive current for a solenoid-powered actuator for adjustment of the pressure-differential dependent flow of a fluid. The scale of the pressure effect generated by the actuator can be determined in advance by means of the strength of the electrical drive for the actuator, even without the use of pressure sensors, whereby one or more actuator-specific calibration curves or constants KGind for the actuator are derived, such that a set flow (G) can be specifically achieved using said constants by adjustment with the strength of the current (I). The actuator-specific constants are automatically determined without the use of pressurising the actuator. The method can be used to control solenoid valves for ABS vehicle braking systems. Said solenoid valves are intrinsically configured to fully open and close, but can be given corresponding regulatory functions by means of the control system.

    ELEKTRONISCHES KRAFTFAHRZEUGREGELUNGSSYSTEM MIT STROMMESSSCHALTUNG
    10.
    发明公开
    ELEKTRONISCHES KRAFTFAHRZEUGREGELUNGSSYSTEM MIT STROMMESSSCHALTUNG 有权
    与电流测量电路,电子机动车调节系统

    公开(公告)号:EP2265478A1

    公开(公告)日:2010-12-29

    申请号:EP09726060.8

    申请日:2009-03-25

    摘要: The invention relates to an electronic motor vehicle control system having at least one valve actuating circuit (2a, 2b) which controls a load current by means of pulse width modulation, and having at least one electronic current measuring circuit which has at least one measurement path (1, 3) with at least one analog/digital converter (13, 33) which converts an analog measurement signal of the load current into a digital measurement signal of the load current and which is actuated or designed in such a way as to carry out a plurality of current measurements per PWM period, wherein the at least one measurement path (1, 3) of the current measurement circuit has a signal conservation circuit (12, 32) which provides the analog measurement signal of the load current substantially unchanged, and independent of the actual load current, for at least a defined hold time (t
    off->on , t
    on->off ).