EQUIPMENT AND METHOD FOR DEMOLISHING A BUILDING
    1.
    发明公开
    EQUIPMENT AND METHOD FOR DEMOLISHING A BUILDING 有权
    拆除建筑物的设备和方法

    公开(公告)号:EP2769032A1

    公开(公告)日:2014-08-27

    申请号:EP11811131.9

    申请日:2011-10-20

    申请人: Despe S.p.A.

    IPC分类号: E04G23/08 E04G3/22 E04G3/24

    摘要: An equipment (1) for demolishing a building (2), wherein said building (2) comprises a building base (3) placed in proximity of a ground (4), or placed on the ground (4), and an opposite building top (5) or temporary building top (5) arranged away from said building base (3), as well as building floors (6), comprises: - a platform (7) adapted to be positioned against the top of the building (5) avoiding ground support devices which from the platform (7) reach the base of the building (3) or the ground (4) surrounding the building; said platform (7) comprising at least one working scaffold (8) adapted to be arranged along the periphery (9) of said building (2) and to face at least one floor (6) of said building (2); - said at least one working scaffold (8) being supported, hanged, on said platform (7) so that it descends along the side wall (10) of the building (2) to border the works for demolishing the building (2).

    摘要翻译: 一种用于拆除建筑物(2)的设备(1),其中所述建筑物(2)包括放置在地面(4)附近或放置在地面(4)上的建筑物基部(3),以及相对的建筑物顶部 (5)或远离所述建筑物基部(3)布置的临时建筑物顶部(5)以及建筑物地板(6)包括: - 适于抵靠建筑物(5)的顶部定位的平台(7) 避免从平台(7)到达建筑物(3)的底部或围绕建筑物的地面(4)的地面支撑装置; 所述平台(7)包括至少一个适于沿所述建筑物(2)的周边(9)布置并且面对所述建筑物(2)的至少一个地板(6)的工作脚手架(8); - 所述至少一个工作脚手架(8)被支撑,悬挂在所述平台(7)上,使得其沿着建筑物(2)的侧壁(10)下降以与用于拆除建筑物(2)的工程接壤。

    CLIMBING EQUIPMENT AND CLIMBING METHOD FOR THE CONSTRUCTION OF BUILDINGS

    公开(公告)号:EP3368730A1

    公开(公告)日:2018-09-05

    申请号:EP16801580.8

    申请日:2016-10-25

    申请人: Despe S.p.A.

    IPC分类号: E04G3/28

    摘要: Climbing equipment for the construction of a building, including a scaffold that at least partially surrounds the perimeter of a building floor and is provided with a walkable surface. The climbing equipment includes a traction device comprising a first portion integral with the scaffold, and a second portion connected to the first portion. The first portion includes a first coupling element adapted to grip a first coupling portion of the building, and the second portion includes a second coupling element, arranged at a different level than the first coupling element, and adapted to grip a second coupling portion of the building. The climbing equipment further comprises a moving system. When the first coupling element is released from the respective coupling portion, the moving system performs a relative movement between the first portion and said second portion of the traction device, so as to move the scaffold by a predetermined amount.