Method of and apparatus for operating equipment installed in marine seismic tows
    1.
    发明公开
    Method of and apparatus for operating equipment installed in marine seismic tows 失效
    geschlepptenGeräten的Vereahren undGerätfürOperationsanordnung montiert在meeresseismischen。

    公开(公告)号:EP0562781A2

    公开(公告)日:1993-09-29

    申请号:EP93302115.6

    申请日:1993-03-19

    申请人: GECO A.S.

    IPC分类号: G01V1/20 G01V1/38

    CPC分类号: G01V1/38 H02J7/34

    摘要: In order to be able to operate special equipment provided in seismic cables, which comprise gun cables and streamers (2, 3), during seismic surveys at sea, a method and a device are provided which enable energy to be supplied through wires (4) to the equipment (B, C, D) in the cables, without this energy supply affecting the seismic surveys. In order to achieve this, low output energy is supplied through the wires (4) and used to charge batteries (6) of operating devices, which batteries can emit for brief periods sufficiently high outputs of energy in order to perform the necessary operation of the equipment. The device also comprises equipment required for control of the operation.

    摘要翻译: 为了能够在海上地震勘测期间操作包括枪缆和拖缆(2,3)的地震电缆中提供的特殊设备,提供了一种能够通过电线(4)供应能量的方法和装置, 到电缆中的设备(B,C,D),没有这种能量供应影响地震勘测。 为了实现这一点,通过电线(4)提供低输出能量,并用于对操作装置的电池(6)充电,该电池可以短时间地发射足够高的能量输出,以执行必要的操作 设备。 该装置还包括控制操作所需的设备。

    Deflector
    2.
    发明公开
    Deflector 失效
    Ottergerät。

    公开(公告)号:EP0562780A1

    公开(公告)日:1993-09-29

    申请号:EP93302114.9

    申请日:1993-03-19

    申请人: GECO A.S.

    IPC分类号: B63B21/66 A01K73/045

    摘要: A deflector which is intended for installation in the tow-line (4, 5) between a towing vessel and a tow which is located in the water, e.g. a cable with seismic sources or seismic source array, is suspended from a float (1) and is installed between a tow-point (7) on the tow-line (4) and an attachment point (8) for the further connection (5) to the tow. In order to be able to locate the deflector in a desired position in relation to the towing vessel and compensate for alterations in the effects of forces from the tow or vessel in addition to movements in the water, the tow-line (5) which leads to the tow from the deflector body (2) is attached to the deflector via a pivotable lever (10) which is situated at the same height as the deflector body's lifting force centre. The tow-point (7) for the tow-line (4) is provided at one lateral surface of the body in front of its vertical centre line. An additional deflector wing (18) may be incorporated in the tow-line (5).

    摘要翻译: 用于安装在牵引容器和位于水中的丝束之间的牵引线(4,5)中的偏转器,例如。 具有地震源或地震源阵列的电缆从浮子(1)悬挂并且安装在牵引线(4)上的牵引点(7)和用于进一步连接的附接点(8)之间(5 )到拖曳。 为了能够将偏转器相对于牵引容器定位在期望的位置,并且除了水中的运动之外还补偿来自丝束或容器的力的影响的改变,引导线(5) 通过位于与偏转器主体的提升力中心相同的高度的可枢转的杆(10)将来自偏转器主体(2)的丝束附接到偏转器。 牵引线(4)的牵引点(7)设置在主体的垂直中心线前侧的一个侧面。 另外的导流翼(18)可以结合在牵引线(5)中。

    Method of and apparatus for operating equipment installed in marine seismic tows
    3.
    发明公开
    Method of and apparatus for operating equipment installed in marine seismic tows 失效
    在海洋地震下安装设备的方法和装置

    公开(公告)号:EP0562781A3

    公开(公告)日:1994-07-20

    申请号:EP93302115.6

    申请日:1993-03-19

    申请人: GECO A.S.

    IPC分类号: G01V1/20 G01V1/38

    CPC分类号: G01V1/38 H02J7/34

    摘要: In order to be able to operate special equipment provided in seismic cables, which comprise gun cables and streamers (2, 3), during seismic surveys at sea, a method and a device are provided which enable energy to be supplied through wires (4) to the equipment (B, C, D) in the cables, without this energy supply affecting the seismic surveys. In order to achieve this, low output energy is supplied through the wires (4) and used to charge batteries (6) of operating devices, which batteries can emit for brief periods sufficiently high outputs of energy in order to perform the necessary operation of the equipment. The device also comprises equipment required for control of the operation.