公开(公告)号:EP2631222A4
公开(公告)日:2016-01-06
申请号:EP11833864
申请日:2011-10-20
申请人: KAWASAKI HEAVY IND LTD , ANHUI CONCH GROUP COMPANY LTD , ANHUI CONCH KAWASAKI ENGINEERING COMPANY LTD , BUILDING MATERIAL DESIGN AND RES INST OF ANHUI CONCH , ANHUI CONCH KAWASAKI ENERGY CONSERVATION EQUIPMENT MFG COMPANY LTD , ANHUI TONGLING CONCH CEMENT COMPANY LTD
发明人: GUO WENSAN , LI SHUNAN , HE CHENGFA , ZHANG CHANGLE , LI DAMING , LI QUNFENG , WANG KECHUN , LI ZHAOHUI , XIAO JIEYU , CHENG XIAOBING , YANG CHANGQING , HAYASHI TOSHIKAZU , INOUE EIJI , KATAHATA TADASHI , KATOH SADAFUMI , ICHITANI NOBORU , HASHIMOTO ATSUSHI , TOSHIHIRO JUN
CPC分类号: C04B7/4446 , F23G5/0276 , F23G5/30 , F23G5/46 , F23G5/50 , F23G2201/303 , F23G2206/201 , F23G2207/20 , Y02E20/363
摘要: A waste treatment facility 100 is constructed in vicinity of a cement production facility 200. This comprises: a gasification furnace 1 for gasifying waste to generate a pyrolysis gas; and a gas transport line 6 for transporting the pyrolysis gas generated in the gasification furnace 1 to a calciner 20 or the like in the cement production facility 200 while containing entrained char and ash, The flow rate of the pyrolysis gas from the gasification furnace 1 is limited to a level below a predetermined flow rate ratio over the flow rate of the exhaust gas from the calciner 20 to reduce the fluctuation of the temperature in the calciner 20, so that the stability in the operation of the cement production facility 200 is ensured. The pyrolysis gas may be introduced to the calciner 20 from the gas transport line 6 so as to swirl along the peripheral wall section 23.
摘要翻译: 垃圾处理设备100被构造在水泥生产设备200附近。这包括:气化炉1,用于气化废物以产生热解气; 以及用于将气化炉1中产生的热分解气体输送到水泥生产设备200中的煅烧炉20等的气体输送管线6,同时含有夹带的焦炭和灰分。来自气化炉1的热解气体的流量为 被限制在低于来自煅烧炉20的废气的流量的预定流量比之下的水平,以减少煅烧炉20中的温度波动,从而确保了水泥生产设备200的运行的稳定性。 热解气体可以从气体输送管线6引入煅烧炉20,以便沿着周壁部分23旋转。