Method and apparatus for measuring return flow in a well
    1.
    发明公开
    Method and apparatus for measuring return flow in a well 审中-公开
    Bohrloch在einem的Verfahren und Vorrichtung zurRückflussmessung

    公开(公告)号:EP2110510A1

    公开(公告)日:2009-10-21

    申请号:EP08290372.5

    申请日:2008-04-15

    IPC分类号: E21B47/09 G01B9/00

    摘要: The invention provides apparatus for use in a wellbore made of a casing and an annular with a fluid within, comprising: a reel of wound optic fiber line fixed to an object within the casing, and a light transmitter/receiver device able to generate a signal through the optic fiber line and to measure a change of said signal; wherein the optic fiber line is: (a) on a first position fixed to a reference point linked to the light transmitter/receiver device, and is (b) on a second position unwound from the reel; wherein the light transmitter/receiver device is able to measure the change of said signal when occurring at the second position; and the apparatus having a system able to measure the flow rate of the fluid exiting the annular at the surface level Q r . The apparatus can further comprise a sensor and/or an actuator.

    摘要翻译: 本发明提供了一种用于由壳体制成的井眼和具有流体的环形体的装置,包括:固定到壳体内的物体的卷绕的光纤线束,以及能够产生信号的光发射器/接收器装置 通过光纤线路测量所述信号的变化; 其中所述光纤线路是:(a)在固定到与所述光发射机/接收机设备相关联的参考点的第一位置处,并且(b)在从所述卷轴展开的第二位置; 其中所述光发射器/接收器装置能够在发生在所述第二位置时测量所述信号的变化; 并且该装置具有能够测量在表面级Q r处离开环形的流体的流量的系统。 该装置还可包括传感器和/或致动器。

    Methods and apparatus for well construction
    2.
    发明公开
    Methods and apparatus for well construction 有权
    维尔法赫恩和沃尔里奇特·祖恩·爱因奇顿

    公开(公告)号:EP1798370A1

    公开(公告)日:2007-06-20

    申请号:EP05292716.7

    申请日:2005-12-14

    IPC分类号: E21B43/10

    CPC分类号: E21B7/20 E21B43/103

    摘要: A method of constructing a borehole (10) drilled with a drilling apparatus (16), the method comprises:
    connecting a flexible tubular liner sleeve around the outside of the drilling apparatus and connecting the sleeve (22) around an upper opening of the borehole so as to pass into the borehole; progressively extending the sleeve into the borehole as drilling progresses while maintaining connection to the drilling apparatus and borehole opening; at a predetermined point in the drilling, expanding the sleeve so as to contact the borehole wall; and setting the sleeve so as to be fixed to the borehole wall after expansion. Apparatus for use in such a method comprises: a flexible, expandable sleeve; a first connector for connecting the sleeve around the outside of a drilling assembly; and a second connector for connecting the sleeve around the opening of the borehole; wherein the sleeve is arranged to extend through the borehole between the connectors as drilling progresses.

    摘要翻译: 一种构造用钻孔设备(16)钻孔的钻孔(10)的方法,所述方法包括:将柔性管状衬套套筒围绕钻孔设备的外部连接并将套筒(22)连接在钻孔的上部开口周围 进入井眼; 随着钻井进行,套筒逐渐地延伸到钻孔中,同时保持与钻孔装置和钻孔开口的连接; 在钻孔中的预定点处,使套筒膨胀以接触钻孔壁; 并设置套筒,以便在膨胀后固定到井壁。 用于这种方法的装置包括:柔性可膨胀套筒; 用于将套筒连接在钻井组件的外部的第一连接器; 以及用于将所述套筒围绕所述钻孔的开口连接的第二连接器; 其中所述套筒布置成在钻孔进行时延伸穿过所述连接器之间的钻孔。

    Method and apparatus for measuring a parameter within the well of a plug
    5.
    发明公开
    Method and apparatus for measuring a parameter within the well of a plug 审中-公开
    用于测量井下参数与插头的方法和设备

    公开(公告)号:EP2213831A2

    公开(公告)日:2010-08-04

    申请号:EP10075190.8

    申请日:2008-04-23

    IPC分类号: E21B33/16 E21B47/12 E21B47/00

    摘要: The invention provides a system for measuring a parameter within a well, made of: a first apparatus comprising a first reel (41) of first wound optic fiber line (or fiber) able to be unwound from the first reel, at least a first sensor (51) able to measure the parameter of the well, wherein an information on said parameter can be transmitted trough the first optic fiber (11); a second apparatus comprising a second reel (40) of second wound optic fiber line able to be unwound from the second reel, an extremity of the second optic fiber (10) being fixed to a reference point; a light transmitter or receiver device (12) linked to the reference point and able to generate or detect a light pulse through the second optic fiber line (10); and means to exchange said light pulse between first (11) and second optic fiber line (10).

    摘要翻译: 本发明提供一种系统,用于测量在井内的参数,由:包括第一卷绕的光学纤维线(或纤维),其能够的第一卷轴(41)的第一装置从所述第一卷筒上退绕下来,至少一个第一传感器 (51)能够测量井的参数,worin到关于所述参数可以是反式mitted槽第一光纤(11); 包括第二卷绕的光学纤维线的一个第二卷轴(40)能够在第二装置从所述第二卷轴上被固定到参考点的第二光纤(10)的末端退绕; 链接到所述参考点和能产生或通过第二光纤线(10)检测的光脉冲光发射器或接收器装置(12); 和手段来交换第一(11)和第二光学纤维线(10)之间的所述光脉冲。

    Method and apparatus for measuring a parameter within the well with a plug
    7.
    发明公开
    Method and apparatus for measuring a parameter within the well with a plug 审中-公开
    用于测量井下参数与插头的方法和设备

    公开(公告)号:EP2213830A2

    公开(公告)日:2010-08-04

    申请号:EP10075189.0

    申请日:2008-04-23

    IPC分类号: E21B33/16 E21B47/12 E21B47/00

    摘要: The invention provides a system for measuring a parameter within a well, made of: a first apparatus comprising a first reel (41) of first wound optic fiber line (or fiber) able to be unwound from the first reel, at least a first sensor (51) able to measure the parameter of the well, wherein an information on said parameter can be transmitted trough the first optic fiber (11); a second apparatus comprising a second reel (40) of second wound optic fiber line (10) able to be unwound from the second reel (40), an extremity of the second optic fiber being fixed to a reference point; a light transmitter or receiver device (12) linked to the reference point and able to generate or detect a light pulse through the second optic fiber line (10); and means to exchange said light pulse between first (11) and second optic fiber line (10).

    摘要翻译: 本发明提供一种系统,用于测量在井内的参数,由:包括第一卷绕的光学纤维线(或纤维),其能够的第一卷轴(41)的第一装置从所述第一卷筒上退绕下来,至少一个第一传感器 (51)能够测量井的参数,worin到关于所述参数可以是反式mitted槽第一光纤(11); 包括第二卷绕的光学纤维线的一个第二卷轴(40)(10)能够在第二设备从所述第二光纤的末端的第二卷轴(40)被固定到参考点退绕; 链接到所述参考点和能产生或通过第二光纤线(10)检测的光脉冲光发射器或接收器装置(12); 和手段来交换第一(11)和第二光学纤维线(10)之间的所述光脉冲。

    Borehole stabilisation
    9.
    发明公开
    Borehole stabilisation 有权
    Stabilisierung eines Bohrlochs

    公开(公告)号:EP1300545A1

    公开(公告)日:2003-04-09

    申请号:EP01402583.7

    申请日:2001-10-08

    摘要: A method of stabilising an unconsolidated zone (18) of a borehole, including the steps of: forming a region of the borehole having enlarged diameter (22) in the unconsolidated zone when compared to the adjacent region above; positioning a fluid-filled casing (26) in the borehole extending across the unconsolidated zone and into the adjacent region above, the liner having a pipe (28) extending therethrough into a lower portion and being connected to a cement supply at the surface; pumping cement from the surface inside the pipe so as to exit the liner at the lower portion and flow upwards to fill the annulus (44) formed between the outside of the liner and the borehole in the unconsolidated zone and to extend into the adjacent region above; withdrawing the pipe (28) from the casing while pumping fluid therethrough so as to maintain the liner substantially fluid-filled and to displace cement above the liner in the adjacent region; and drilling through the cement and liner in the unconsolidated zone after the cement has set to form a borehole of substantially similar diameter to that of the adjacent region above.

    摘要翻译: 一种稳定钻孔的未固结区域(18)的方法,包括以下步骤:当与上述相邻区域相比时,在未固结区域中形成具有增大的直径(22)的钻孔区域; 将流体填充的壳体(26)定位在延伸穿过未松散区域并进入上方相邻区域的钻孔中,衬套具有穿过其延伸到下部并连接到表面上的水泥供应的管道(28) 从管道内的表面抽出水泥,以便在下部排出衬套并向上流动,以填充形成在衬套的外部和未固结区域中的钻孔之间的环形空间(44)并延伸到上方的相邻区域 ; 在将流体从所述壳体中抽出管道的同时,使所述管路保持基本上流体填充并且使相邻区域中的所述衬套上方的水泥置换; 并且在水泥已经设置成形成与上述相邻区域的直径基本相似的钻孔之后,在未固结区域中穿过水泥和衬垫。