公开(公告)号:EP0721027B1
公开(公告)日:2001-09-19
申请号:EP95120567.3
申请日:1995-12-27
发明人: Sato, Isao, c/o Shoseki Kakoh K.K. , Sakuma, Yoshimitsu, c/o Shoseki Kakoh K.K. , Sasaki, Yoshiomi, c/o Maeda Kosen Co., Ltd.
CPC分类号: E01D19/086 , E01C11/228
-
公开(公告)号:EP0721027A1
公开(公告)日:1996-07-10
申请号:EP95120567.3
申请日:1995-12-27
发明人: Sato, Isao, c/o Shoseki Kakoh K.K. , Sakuma, Yoshimitsu, c/o Shoseki Kakoh K.K. , Sasaki, Yoshiomi, c/o Maeda Kosen Co., Ltd.
CPC分类号: E01D19/086 , E01C11/228
摘要: The drainage system includes a base layer (2), a first layer (3) laid on the base layer, a second layer (6) laid on the first layer, a pair of gutters (8) longitudinally provided on both sides of the road, a first braided pipe (10) fabricated by weaving together a predetermined number of warps (11) and a lot of woofs (12) made of heat resistant synthetic fiber, the braided pipe being disposed along the gutter (8) and the downstream-side end of the top surface of the first layer (5), the drainage channel being communicated to catch basins (9) located at the gutter.
摘要翻译: 排水系统包括基层(2),放置在基层上的第一层(3),放置在第一层上的第二层(6),纵向设置在道路两侧的一对槽 ,通过将预定数量的经纱(11)和大量由耐热合成纤维制成的纬纱(12)编织在一起而制成的第一编织管(10),所述编织管沿着所述沟槽(8)和所述下游管 第一层(5)的顶表面的侧端,排水通道被连通到位于沟槽处的捕集池(9)。
-