It is described a method for operating an electric energy production facility (100) comprising at least one wind turbine (101, 102, 103, 104), in particular during a fault in a utility grid (109) to which energy is to be delivered, the method comprising: disconnecting the utility grid (109) from the wind turbine (101, 102, 103, 104); connecting an external generator (166) via a cable (111,112,113,114) to an auxiliary equipment (171,172,173,174) of the wind turbine, to deliver active power (P) to the auxiliary equipment, wherein the cable is connected to a converter (141,142,143,144) of the wind turbine the converter supporting reactive power (Q). Further a corresponding arrangement is described.
摘要:
It is described a method for operating an electric energy production facility (100) comprising at least one wind turbine (101, 102, 103, 104), in particular during a fault in a utility grid (109) to which energy is to be delivered, the method comprising: disconnecting the utility grid (109) from the wind turbine (101, 102, 103, 104); connecting an external generator (166) via a cable (111,112,113,114) to an auxiliary equipment (171,172,173,174) of the wind turbine, to deliver active power (P) to the auxiliary equipment, wherein the cable is connected to a converter (141,142,143,144) of the wind turbine the converter supporting reactive power (Q). Further a corresponding arrangement is described.
摘要:
It is described a method for controlling a wind farm connected to a grid, wherein the wind farm comprises a wind farm emergency generator and at least a first wind turbine, wherein the first wind turbine comprises a wind turbine transformer, a wind turbine converter and auxiliary equipment, wherein the method comprises detecting a lost grid connection, providing active power to the auxiliary equipment via the wind farm emergency generator, providing reactive power via the wind turbine converter.
摘要:
It is described a wind farm comprising a collector grid (106) and a wind turbine (102) being connected to the collector grid (106), wherein the wind turbine (102) comprises a wind turbine transformer (105), and a wind turbine transformer bypass switch (119) and it is disclosed a method for operating a wind farm comprising measuring a collector grid voltage, and bypassing a wind turbine transformer if the measured collector grid voltage is below a first predetermined threshold voltage.
摘要:
The method invented aims for an improved start-up of a wind turbine, which is in Island Mode Operation. The transformer (161) of the wind turbine (101) is connected with a power source (166). The power source provides a pre-defined voltage to the transformer. The pre-defined voltage is ramped down to demagnetize the transformer. The wind turbine with the demagnetized transformer is subjected to a start-up sequence, which is used to provide power from the power source via the transformer to components (e.g. auxiliary equipment (171)) of the wind turbine.
摘要:
It is described a method for determining a voltage bounding range (125) defining a range of a wind turbine reference voltage (123) for a wind turbine (101) for controlling an output voltage (Vturb) of the wind turbine at a wind turbine output terminal (113), the method comprising: obtaining information regarding an electrical characteristic of a transmission line (106) connecting the wind turbine output terminal (113) to a point of common coupling (111) to which plural other wind turbines are connectable; and defining the voltage bounding range (125) based on the electrical characteristic of the transmission line (106).
摘要:
The invention relates to a method to stabilize an electrical grid, which is subjected to a grid fault, by a wind energy installation like a wind turbine or a wind farm. A deviation of the grid frequency (Delta_f) from a nominal frequency is determined at a connection point of the wind energy installation with the electrical grid. The grid frequency deviation (Delta_f) is counteracted by an active current, which is fed by a frequency converter of the wind energy installation to the electrical grid. The deviation of the grid voltage (Delta_U) from a nominal voltage is determined at the connection point. The grid voltage deviation (Delta_f) is counteracted by a reactive current, which is fed by the frequency converter of the wind energy installation to the electrical grid. The grid frequency deviation (Delta f) and the grid voltage deviation (Delta_U) are determined at the same time and the active current and the reactive current for the respective counteraction are determined in dependency of each other and in dependency of the maximum current of the frequency converter.
摘要:
It is described a wind park control system (101) for controlling a reactive power output of a plurality of wind turbines (105, 106, 107) of a wind park (100), wherein the wind park is adapted to deliver active power and reactive power to a utility grid (417). The wind park control system (101) comprises a determination unit (102) being adapted to determine a total amount of reactive power being required by the utility grid (417) and being adapted to determine for each wind turbine (105, 106, 107) an individual amount of reactive power, which the wind turbine (105, 106, 107) is capable to deliver, a calculation unit (103) being adapted to calculate a capability scheme, wherein the capability scheme comprises an order for the plurality of wind turbines (105, 106, 107) according to which order the wind turbines (105, 106, 107) are selected for delivering reactive power, wherein the capability scheme is calculated based on the determined individual amount of reactive power of each wind turbine (105, 106, 107) and the total electrical power loss being contributed by each connection of all the wind turbines (105, 106, 107) to the utility grid (417), and an adjustment unit (104) being adapted to adjust an actual amount of reactive power to be provided by the plurality of wind turbines (105, 106, 107), wherein the reactive power output of each wind turbine (105, 106, 107) is controlled based on the calculated capability scheme wherein the wind turbines (105, 106, 107) are selected for delivering reactive power in the order of the capability scheme, such that the determined total amount of reactive power is fulfilled.
摘要:
It is described a method for controlling a wind turbine (101) connected to a node (127) connected to a utility grid (129), wherein to the node a plurality of other wind turbines (102) is connected, the method comprising: measuring a quantity (134, 135, 136) indicative of a slope (403) of a voltage (V) at the node (127) in dependence of active power (P) delivered to the node; determining that the slope (403) is smaller than a negative slope limit (414); performing a measure, in order to increase the slope (403) above the slope limit (414).
摘要:
It is described a method for controlling a wind farm connected to a grid, wherein the wind farm comprises a wind farm emergency generator and at least a first wind turbine, wherein the first wind turbine comprises a wind turbine transformer, a wind turbine converter and auxiliary equipment, wherein the method comprises detecting a lost grid connection, providing active power to the auxiliary equipment via the wind farm emergency generator, providing reactive power via the wind turbine converter.