-
-
公开(公告)号:EP4416372A1
公开(公告)日:2024-08-21
申请号:EP22881870.4
申请日:2022-10-17
发明人: SUBBIAH, Surej Kumar , MOHAMAD HUSSEIN, Assef , CHEN, Ying Ru , PEARCE, Andrew , RODRIGUEZ HERRERA, Adrian Enrique , NI, Qinglai
CPC分类号: G01V2210/6620130101 , G01V2210/624220130101 , E21B43/00 , E21B2200/2020200501 , G01V20/00
-
公开(公告)号:EP4405563A1
公开(公告)日:2024-07-31
申请号:EP22873793.8
申请日:2022-09-16
-
公开(公告)号:EP4388444A1
公开(公告)日:2024-06-26
申请号:EP22859151.7
申请日:2022-08-18
CPC分类号: E21B43/16 , G06F30/20 , G06F30/28 , G06N20/00 , G06Q50/02 , G06Q10/06 , E21B43/00 , E21B2200/2020200501 , G06F2113/0820200101 , G06F30/27
-
公开(公告)号:EP2844831B1
公开(公告)日:2018-12-05
申请号:EP13803872.4
申请日:2013-05-28
IPC分类号: E21B43/00
CPC分类号: G05B13/042 , E21B43/00 , G05D7/0617
摘要: Systems and methods for determining operating settings for a fluid production system that includes wells and a processing facility, the method including identifying at least one swing well and one or more non-swing wells and determining at least one target parameter equation that is a function of at least one processing facility constraint and one or more non-swing well parameters. The method further includes incorporating the target parameter equation into a fully-coupled equation set representing the production system, simulating the production system using the fully-coupled equation set to obtain one or more operating settings that meet the processing facility constraint, and presenting to a user the operating settings.
-
6.
公开(公告)号:EP3371416A1
公开(公告)日:2018-09-12
申请号:EP15907920.1
申请日:2015-11-02
发明人: FILIPPOV, Andrey , KHORIAKOV, Vitaly , JIA, Xinli
CPC分类号: G06F17/5013 , E21B43/00 , E21B43/26 , G01V99/005 , G01V2210/624 , G01V2210/64
摘要: Methods and systems are presented in this disclosure for performing fast economic analysis of production by fracture-stimulated wells. A class of models can be defined by combining a simulated fracture geometry comprising a stimulated reservoir volume with accounting for fluid dynamics and phase transitions in the stimulated reservoir volume for modeling production in a plurality of reservoirs. An objective function related to the production in the plurality of reservoirs can be generated based on at least one model from the class of models. Parameters related to fracture stages of a fracture network can be then determined, based on the objective function, and communicated, via a computer network to a computing device, to be used for at least one of building or operating the fracture network in the reservoir.
-
公开(公告)号:EP3371414A1
公开(公告)日:2018-09-12
申请号:EP16791594.1
申请日:2016-11-04
申请人: Solution Seeker AS
CPC分类号: E21B47/10 , E21B33/12 , E21B34/06 , E21B41/00 , E21B43/00 , E21B43/122 , E21B47/06 , E21B47/065 , E21B49/08
摘要: A method for assessment of an oil and gas flow network comprises: (1) gathering historical data and/or live data relating to the status of multiple control points at different branches within the flow network and to one or more flow parameter(s) of interest in one or more flow path(s) of the flow network d; (2) identifying time intervals in the data during which the control points and the flow parameters are in a steady state; and (3) extracting statistical data representative of some or all steady state intervals identified in step (2) to thereby represent the original data from step (1) in a compact form.
-
公开(公告)号:EP2850467B1
公开(公告)日:2018-06-20
申请号:EP13790643.4
申请日:2013-03-13
CPC分类号: G06F17/5009 , E21B43/00 , G01V99/005 , G06N3/10
摘要: Predicting future hydrocarbon production. At least some of the illustrative embodiments are methods including: reading data regarding hydrocarbon production from a hydrocarbon producing field; producing at least one value indicative of future hydrocarbon production based on a data model and the data regarding hydrocarbon production; displaying, on a display device of a computer system, an indication of historic data regarding hydrocarbon production; and displaying, on the display device, an indication of the at least one value indicative of future hydrocarbon production.
-
9.
公开(公告)号:EP2671167A4
公开(公告)日:2018-01-31
申请号:EP11857923
申请日:2011-01-31
发明人: FLEMING GRAHAM , WONG TERRY
CPC分类号: G06N3/08 , E21B43/00 , G05B13/027 , G05B17/02
摘要: A method for implementing a reservoir simulator is described. The method comprises developing training data by performing a calculation on an initial set of input data relating to reservoir conditions to obtain corresponding output data; training an artificial neural network (“ANN”) to perform the calculation using the training data; and using the trained ANN to perform the calculation on a second set of input data to obtain corresponding output data for use by the reservoir simulator in performing simulations.
-
公开(公告)号:EP1883840A4
公开(公告)日:2017-12-20
申请号:EP06749617
申请日:2006-04-10
发明人: KIM CHUL SUNG , DOBIN MARK W
CPC分类号: G01V99/005 , E21B43/00 , G01V1/302 , G01V2210/641 , G01V2210/644
摘要: Methods for analyzing the connected quality of a hydrocarbon reservoir are disclosed. A model of a portion of the reservoir is divided into cells, each cell having a volume and some attributes, and wherein a speed function is assigned to a portion of the cells. A reference cell is chosen. A connectivity between cells in the reservoir is determined by solving an Eikonal equation that describes the travel time propagation, said propagating front progressing outward from a reference cell until an ending condition is met, said Eikonal equation being solved by a fast marching method with propagation velocity as a function of spatial position being provided by the speed function. Regions of the reservoir are characterized by their connective quality to the reference cell using the connectivity.
-
-
-
-
-
-
-
-
-