DEMOLISHING AN OFFSHORE JACKET
    2.
    发明公开

    公开(公告)号:EP4019701A1

    公开(公告)日:2022-06-29

    申请号:EP22152758.3

    申请日:2018-07-05

    摘要: A method in which a low-lying piece, for example the lower part, is removed from a structure and the construction is then lowered and the low-lying piece, for example the lower part, is removed. In this way one can demolish a large spatial framework construction of steel pipes as used in the offshore industry, for example a jacket to carry a platform or a windmill.

    Messverfahren zum Heben und/oder Senken eines Bauwerks sowie Messvorrichtungen zur Durchführung des Verfahrens
    4.
    发明公开
    Messverfahren zum Heben und/oder Senken eines Bauwerks sowie Messvorrichtungen zur Durchführung des Verfahrens 失效
    用于提升和/或结构的降低以及测量用于实施该方法的装置的测量方法。

    公开(公告)号:EP0457973A1

    公开(公告)日:1991-11-27

    申请号:EP90250135.2

    申请日:1990-05-25

    发明人: Zestermann, Mario

    IPC分类号: E02D35/00 E04G23/06

    CPC分类号: E04G23/06 E02D35/00

    摘要: Verfahren zum Heben und/oder Senken eines Gebäudes mittels hydraulischer Hubvorrichtungen, die rechnergesteuert einzeln nacheinander oder gruppenweise gleichzeitig ansteuerbar sind, sowie Meßvorrichtungen wobei die einzelnen Hubvorrichtungen jeweils mit Niveaumeßvorrichtungen versehen sind, und eine zentrale Einrichtung zur Ermittlung einer Gebäudeposition vorgesehen ist, wobei jede Hubvorrichtung (1) zusätzlich mit einem Druckaufnehmer (2) versehen ist, und daß von jeder Hubvorrichtung (1) Datenleitungen (5) zu einer zentralen Recheneinheit (8) führen, welche die bei den einzelnen Hubvorrichtungen ermittelten Hub- und/oder Druckwerte übermitteln, und daß die ermittelten Werte einzeln mit in einem Speicher (9) der zentralen Einrichtung (13) festgehaltenen Werten verglichen werden und in Abhängigkeit von dem Vergleichsergebnis die einzelnen Hubvorrichtungen (1) angesteuert werden sowie Vorrichtung zur Durchführung des Verfahrens.

    摘要翻译: 本发明涉及一种用于提升和/或降低由液压升降装置,可以单独依次地或同时地在计算机的控制下基团被活化的指建筑物,以及测量装置,每个被提供有电平测量各个提升装置 被提供的装置和用于确定建筑物的位置的中央装置,每个提升装置(1)还设置有压力拾取(2)。 数据线(5)从每个提升装置(1)向中央计算单元铅(8),该传送确定单独相比确定用于各个提升装置的提升和/或压力值,并且这些值与存储在存储器中的值 (9)中央装置(13)和单独的提升装置(1)的活化作为比较结果的函数。 因此本发明涉及一种用于实施该方法的装置。

    CONSTRUCTION SYSTEM AND METHOD FOR MULTI-FLOOR BUILDINGS
    5.
    发明公开
    CONSTRUCTION SYSTEM AND METHOD FOR MULTI-FLOOR BUILDINGS 有权
    BAUSVERTEM BAUVERFAHRENFÜRMEHRSTÖCKIGEGEBÄUDE

    公开(公告)号:EP2394006A4

    公开(公告)日:2013-11-13

    申请号:EP10738186

    申请日:2010-02-05

    申请人: 3L INNOGENIE INC

    摘要: A multi-floor building construction system for progressively constructing floors on load-bearing means of a foundation as the occupational need to do so arises and while sub-floors can be occupied. A permanent roof structure is displaceably supported over an uppermost floor of at least an upper one of one or more occupational floor spaces. Extensible load support means is secured in the roof structure until the completion of the mufti-floor building. The extensible load support means rests upon the uppermost floor to support the total load of the permanent roof structure. The extensible load support means is extendible downwardly to push against the uppermost floor to raise the permanent roof structure. Adjustable hoisting means is secured inside the permanent roof structure for lifting floor sub-assemblies fabricated in the construction zone using the extensible load support means while simultaneously raising the permanent roof structure.

    摘要翻译: 一个多层建筑施工系统,用于随着职业需要逐渐建造基础承载装置的地板,同时可以占用底层。 永久性屋顶结构被可移动地支撑在至少一个或多个职业楼层空间的上部的最上层。 可扩展的负载支撑装置固定在屋顶结构中,直到完成多层建筑。 可伸缩载荷支撑装置位于最上层,以支撑永久屋顶结构的总载荷。 可伸缩载荷支承装置向下延伸以推靠最上层,以提高永久屋顶结构。 可调升降装置固定在永久屋顶结构内,用于使用可延展的负载支撑装置提升在施工区内制造的地板子组件,同时提升永久屋顶结构。

    Method for creating a building under an architectural monument
    6.
    发明公开
    Method for creating a building under an architectural monument 有权
    由建筑纪念碑建造建筑物的方法

    公开(公告)号:EP2236677A3

    公开(公告)日:2013-06-19

    申请号:EP10003429.7

    申请日:2010-03-30

    申请人: AS Amhold

    发明人: Arvu, Mägi

    摘要: The given invention treats a method for creating a building under an architectural monument, consisting of the following stages: a rigid loadbearing structure 2, which is pre-tensioned, is created under the preserved building 1; temporary piles 5 are driven and cross-beams 3 are installed in structure 2; jacks 7 are installed between cross-beams 3 and temporary piles 5; around the underground part 8 of the preserved building 1 a loadbearing and waterproof structure 9 is created; under the underground part 8, between structure 9 and temporary piles a waterproof horizontal layer 11 is created; a recess is excavated, piles 12, on-pile foundation 13 and loadbearing framework 14 are built, temporary piles 5, jacks 7, cross-beams 3 are removed, whereas the temporary piles are removed down to the on-pile foundation; new ground structures 16 are built, using a transparent material for external borders 17 in order to display the authentically preserved building 1.

    Verfahren und Vorrichtung zum Heben, Senken und/oder Ausrichten eines Gebäudes
    7.
    发明公开
    Verfahren und Vorrichtung zum Heben, Senken und/oder Ausrichten eines Gebäudes 失效
    用于提升,建筑物的降低和/或对准的方法和装置。

    公开(公告)号:EP0404971A1

    公开(公告)日:1991-01-02

    申请号:EP89111633.7

    申请日:1989-06-26

    IPC分类号: E02D35/00 E04G23/06

    摘要: Die Erfindung betrifft ein Verfahren und eine Vorrichtung zum Heben, Senken und/oder Ausrichten eines Gebäudes, bei welchem das Gebäude mittels mehrerer Zylinder-Kolbeneinheiten (1) ausgerichtet wird. Die einzelnen Zylinder-Kolbeneinheiten (1) werden jeweils bis zum Erreichen einer jeweils aus der Statik des Gebäudes für den Ort der Zylinderkolbeneinheit (1) vorgegebenen Belastung betätigt, so daß entsprechend der Statik des Gebäudes sowohl während als auch nach dem Ausrichtvorgang eine entsprechende Krafteinleitung auf die Fundamente sichergestellt ist.

    摘要翻译: 本发明涉及一种方法和用于升高,降低和/或建筑物的对准的装置,其特征在于,由数个活塞缸单元(1)的装置的建筑物被对准。 各个缸活塞单元(1)的每一个致动以从建筑物的液压缸 - 活塞单元(1)给定负荷的地方的静力学分别到达,以便根据建筑物的上期间和对准操作中,对应的力引入后的静 基础保证。

    CONSTRUCTION SYSTEM AND METHOD FOR MULTI-FLOOR BUILDINGS
    9.
    发明公开
    CONSTRUCTION SYSTEM AND METHOD FOR MULTI-FLOOR BUILDINGS 有权
    BAUSYSTEM和施工方法的多层建筑

    公开(公告)号:EP2394006A1

    公开(公告)日:2011-12-14

    申请号:EP10738186.5

    申请日:2010-02-05

    摘要: A multi-floor building construction system for progressively constructing floors on load-bearing means of a foundation as the occupational need to do so arises and while sub-floors can be occupied. A permanent roof structure is displaceably supported over an uppermost floor of at least an upper one of one or more occupational floor spaces. Extensible load support means is secured in the roof structure until the completion of the mufti-floor building. The extensible load support means rests upon the uppermost floor to support the total load of the permanent roof structure. The extensible load support means is extendible downwardly to push against the uppermost floor to raise the permanent roof structure. Adjustable hoisting means is secured inside the permanent roof structure for lifting floor sub-assemblies fabricated in the construction zone using the extensible load support means while simultaneously raising the permanent roof structure.