VERFAHREN ZUR GESTEUERTEN EINHALTUNG EINES KAPPE-KOHLENSTOSS-ABSTANDES BEI STREBBETRIEBEN
    4.
    发明公开
    VERFAHREN ZUR GESTEUERTEN EINHALTUNG EINES KAPPE-KOHLENSTOSS-ABSTANDES BEI STREBBETRIEBEN 有权
    法帽KOHL PUSH距离来操作STREB的控制的柔顺

    公开(公告)号:EP2247826A1

    公开(公告)日:2010-11-10

    申请号:EP08715852.3

    申请日:2008-02-19

    摘要: Disclosed is a method for the controlled maintaining of a mechanically favorable distance (33) between the roof and the face in longwall coal mining operations comprising a face conveyor (20), at least one extraction machine (22), and a hydraulic shield support. In said method, the inclination of the top canopy (13) and the floor skid (11) in the mining direction is determined by means of inclination sensors (17) mounted on at least three of the four main components of each shield support frame (10), such as the floor skid (11), the gob shield (14), the supporting connection rods (16), and in the gob zone of the top canopy (13), the effects on the distance (33) between the roof and the face are determined in a computer unit on the basis of the measured data when the angle of inclination of the top canopy (13) changes, and the parameters that are crucial for the working cycle of the shield support frame (10) are automatically adjusted, said working cycle consisting of a retracting, advancing, and setting process.

    VERFAHREN UND EINRICHTUNG ZUR ÜBERWACHUNG EINER SCHNEIDENDEN GEWINNUNGSMASCHINE
    5.
    发明公开
    VERFAHREN UND EINRICHTUNG ZUR ÜBERWACHUNG EINER SCHNEIDENDEN GEWINNUNGSMASCHINE 有权
    方法和用于监控切割开采机器

    公开(公告)号:EP2242901A1

    公开(公告)日:2010-10-27

    申请号:EP08801555.7

    申请日:2008-08-09

    IPC分类号: E21C35/24

    CPC分类号: E21C35/24 E21C35/12

    摘要: The invention relates to a method and to a device for monitoring the track of a cutting extraction machine (1), which is used in particular in coal mining and can be displaced during longwall mining in a longwall face equipped with face conveyors (9) and longwall advancing (12, 13) along the face (10). The underlying object of the invention is to create a method and a device which make it possible, despite extremely poor visibility conditions, for example in the track of the extraction machine, to detect present obstacles in the form of lowered canopies or drooping folding canopies, sliding canopies or other additions to the lining or overloads of the conveyor in order to take measures for avoiding interruptions in the operation in a timely manner. In order to achieve this object, according to the invention the track of the extraction machine (1) is scanned using a radar measuring device (14) associated with the extraction machine (1) and upon detection of an obstacle an alarm is triggered and/or an invention in the controller of the extraction machine (1) takes place.

    Rock drilling rig and method of positioning rock drilling unit
    10.
    发明公开
    Rock drilling rig and method of positioning rock drilling unit 有权
    Steinbohrplattform und Verfahren zum Positionieren einer Steinbohreinheit

    公开(公告)号:EP2713002A1

    公开(公告)日:2014-04-02

    申请号:EP12186768.3

    申请日:2012-10-01

    发明人: Muona, Jouko

    IPC分类号: E21B7/02 E21C35/24

    CPC分类号: E21B7/022 E21B7/025 E21C35/24

    摘要: The invention relates to a rock drilling rig and a method of positioning a rock drilling unit. The rock drilling rig (5) is provided with a detection device (4) for detecting a reference line (RL), such as a previously drilled drill hole fan (1). The detection device is positioned in the direction of gravity (G). The position and direction of the detected reference line are utilized when positioning a drilling unit to a new drilling position at a predetermined horizontal reference distance (RD) from the reference line.

    摘要翻译: 本发明涉及一种岩石钻机和一种定位岩石钻井单元的方法。 岩石钻机(5)设置有用于检测参考线(RL)的检测装置(4),例如先前钻过的钻孔风扇(1)。 检测装置位于重力方向(G)。 当将钻孔单元定位到距离参考线的预定水平参考距离(RD)的新的钻井位置时,检测到的参考线的位置和方向被使用。