-
公开(公告)号:EP4382237A1
公开(公告)日:2024-06-12
申请号:EP22891807.4
申请日:2022-10-27
发明人: LIN, Chuandong , LIN, Jiang , XUE, Fei
IPC分类号: B23K20/10 , B23K28/02 , H01M10/058 , H01M50/536 , H01M50/538 , H01M4/139
CPC分类号: Y02E60/10 , B23K20/10 , B23K20/26 , B23K26/21 , B23K28/02 , H01M4/139 , H01M10/058 , H01M50/536 , H01M50/538
摘要: A tab welding method, comprising: first, using a toothed welding head to perform first welding on a positive tab and a negative tab which are provided in a stacked manner, so as to form a tab body (30) having a first welding mark region (31), so that the positive tab and negative tab which are provided in a stacked manner are in solid-phase connection; then using a toothless welding head (40) to perform flat welding to form a second welding mark region (32), so as to shape and flatten an uneven region formed after the first welding. Also provided are a battery cell prepared by means of the tab welding method, a battery having the battery cell, and an electric device having the battery. By means of the method, gaps between multiple stacked tabs can be eliminated.
-
公开(公告)号:EP4247582A1
公开(公告)日:2023-09-27
申请号:EP21815456.5
申请日:2021-11-17
-
-
公开(公告)号:EP4039403A1
公开(公告)日:2022-08-10
申请号:EP22157503.8
申请日:2015-04-17
申请人: ArcelorMittal
IPC分类号: B23K26/26 , B23K26/32 , B23K26/30 , B23K26/322 , B23K26/60 , B23K9/173 , B23K26/211 , B23K26/348 , B23K26/361 , B23K26/40 , B23K28/02 , B23K9/167 , B23K101/00 , B23K101/18 , B23K101/34 , B23K103/04 , B23K103/08 , B23K103/00
摘要: L'invention concerne un procédé de préparation de tôles (11, 12) destinées à la fabrication d'un flan soudé d'acier, comprenant les étapes suivantes : on approvisionne au moins une première (11) et une seconde (12) tôles d'acier pré-revêtues, constituées d'un substrat en acier et d'un pré-revêtement constitué d'une couche d'alliage intermétallique en contact avec ledit substrat en acier, surmontée d'une couche métallique d'aluminium ou d'alliage d'aluminium ou à base d'aluminium, la tôle (11) comprenant une face principale, une face principale opposée, et au moins une face secondaire, la tôle (12) comprenant une face principale, une face principale opposée, et au moins une face secondaire), puis on accoste la première (11) et seconde (12) tôle, en laissant un jeu compris entre 0,02 et 2 mm entre les faces secondaires placées en regard, l'accostage de la première (11) et seconde tôle (12) définissant un plan médian perpendiculaire aux faces principales des tôles (11, 12), puis on enlève simultanément par fusion et vaporisation, sur la face principale et la face principale, la couche d'alliage métallique dans une zone périphérique (61) de la tôle (11), et la couche d'alliage métallique dans une zone périphérique (62) de la tôle (12), les zones périphériques (61, 62) étant les zones des faces principales les plus proches par rapport audit plan médian situées de part et d'autre par rapport à celui-ci.
-
5.
-
公开(公告)号:EP3974076A1
公开(公告)日:2022-03-30
申请号:EP21166602.9
申请日:2021-04-01
发明人: WANG, Guofei
IPC分类号: B21C37/29 , B21H3/02 , B23K26/00 , B23K26/282 , B23K26/30 , B23K26/38 , B23K28/02 , B21K21/12 , B21D26/033 , B21D26/037 , B21D41/04 , B23P15/00 , F16L41/00
摘要: The present invention discloses a stainless-steel tee-pipe moulding process, cutting out a main pipe and a secondary pipe from the stainless-steel pipe to replace the copper tee-pipe to resolve the problem that the copper tee-pipe is easy to corrode and causes water pollution; meanwhile, the moulding process of the stainless-steel tee-pipe of the invention is different from the traditional integral forming process, and saves more materials and reduces the production cost compared with the traditional integral forming process.
-
公开(公告)号:EP3826797A1
公开(公告)日:2021-06-02
申请号:EP19780164.0
申请日:2019-09-18
发明人: KAMPS, Tobias , REGULIN, Daniel
-
公开(公告)号:EP3590654A1
公开(公告)日:2020-01-08
申请号:EP19181741.0
申请日:2019-06-21
申请人: The Boeing Company
IPC分类号: B23P15/00 , B23K26/08 , B23K26/38 , B23K28/02 , B23P23/04 , B29C64/147 , B29C69/00 , B32B38/18 , G05B19/418 , B33Y10/00 , B33Y30/00 , B33Y40/00
摘要: An additive manufacturing system (100) includes a foil supply drum (150), a melting energy source (180), and a processor (300). The foil supply drum is configured to be rotated for dispensing a foil sheet (400) over a substrate surface (280) supported by a build element (260). The melting energy source is configured to direct one or more melting energy beams (182) onto a non-melted region (402) of the foil sheet located over the substrate surface. The processor is configured to execute computable readable program instructions (304) based on a three-dimensional digital definition (306) of the object (416), and control the melting energy beam to selectively melt at least some of the non-melted region into melted portions (404) forming a material layer (412) of the object onto the substrate surface while separating the melted portions from non-melted portions, and command rotation of the foil supply drum for dispensing the foil sheet during manufacturing of the object in correspondence with the digital definition.
-
公开(公告)号:EP2889102B1
公开(公告)日:2019-11-13
申请号:EP13827339.6
申请日:2013-08-08
发明人: FUJIMOTO Hiroki , OKADA Tohru , YASUYAMA Masanori
IPC分类号: B23K11/11 , B23K11/00 , B23K11/16 , B23K26/20 , B23K28/02 , B23K26/32 , B23K101/00 , B23K101/18 , B23K26/60 , B23K26/322 , B23K101/34 , B23K103/00 , B23K103/04 , B23K26/244
-
公开(公告)号:EP3536822A1
公开(公告)日:2019-09-11
申请号:EP18160784.7
申请日:2018-03-08
摘要: Die Erfindung betrifft ein Verfahren zur Herstellung eines Werkstoffverbundes aus mindestens einem ersten Werkstoff (2) und einem zweiten Werkstoff (1), wobei der erste Werkstoff (2) einen höheren thermischen Ausdehnungskoeffizient aufweist als der zweite Werkstoff (1). Das Verfahren umfasst die Schritte: Aufheizen des ersten Werkstoffs (2) unter Volumenausdehnung des ersten Werkstoffs (2) auf eine Temperatur, die der im Verfahren anzuwendenden Maximaltemperatur entspricht, Abtragen des ersten Werkstoffs (2) auf die gewünschte Bauteilgeometrie und Verbinden des zweiten Werkstoffs (1) mit dem ersten Werkstoff (2).
-
-
-
-
-
-
-
-
-