PIPE TRANSPORT DEVICE AND PIPE JOINING METHOD INSIDE PIPELINE CONSTRUCTION SHAFT

    公开(公告)号:EP3943709A1

    公开(公告)日:2022-01-26

    申请号:EP20777495.1

    申请日:2020-03-19

    IPC分类号: E21D11/40 F16L1/00 F16L1/028

    摘要: A first transport trolley 12 on which a first pipe 11 is loaded and a second transport trolley 15 on which a second pipe 14 is loaded are moved forward and one end 19 of the first pipe 11 is joined to the other end 20 of the rearmost pipe 4 in a pipeline 2; the other end 20 of the first pipe 11 is lifted; the first transport trolley 12 and the second transport trolley 15 are moved back and the first transport trolley 12 is removed to the front side from under the first pipe 11; a connection member 28 is removed and the first transport trolley 12 and the second transport trolley 15 are separated; the first transport trolley 12 is moved back and pulled in under the second pipe 14 that is loaded on the second transport trolley 15; the second transport trolley 15 is moved forward with the first transport trolley 12 and the one end 19 of the second pipe 14 on the second transport trolley 15 is joined to the other end 20 of the first pipe 11 that is joined to the rearmost pipe 4.

    Tübbing-Abstandssensor für Tunnelbohrmaschine
    5.
    发明公开
    Tübbing-Abstandssensor für Tunnelbohrmaschine 审中-公开
    用于隧道掘进机单体支架距离传感器

    公开(公告)号:EP2740895A3

    公开(公告)日:2016-04-20

    申请号:EP13196094.0

    申请日:2013-12-06

    IPC分类号: E21D9/06 E21D11/40

    摘要: Schild (400) für eine Tunnelbohrmaschine (100) zum Bohren eines Bohrlochs (104) in einem Gebirge (102), wobei das Schild (400) ein Schildrohr (118) zum Schützen eines Abschnitts der Tunnelbohrmaschine (100) vor sich von einer Bohrlochwandung lösendem Gebirgematerial, wobei das Schildrohr (118) vorübergehend zwischen einem zu verlegenden Tübbing (112) zum Auskleiden der Bohrlochwandung einerseits und der Bohrlochwandung andererseits anzuordnen ist, und einen an und/oder in dem Schildrohr (118) angeordneten Sensor (116) zum Detektieren einer für einen Abstand zwischen dem Schildrohr (118) und dem zu verlegenden Tübbing (112) indikativen Information aufweist.

    Verfahren zum temporären Anbringen einer Dichtungsbahn in Tunnelgewölben und Dichtungsbahn dafür
    6.
    发明公开
    Verfahren zum temporären Anbringen einer Dichtungsbahn in Tunnelgewölben und Dichtungsbahn dafür 审中-公开
    的临时附着在隧道拱顶的密封片和防水膜的方法

    公开(公告)号:EP2492438A2

    公开(公告)日:2012-08-29

    申请号:EP12001038.4

    申请日:2012-02-16

    IPC分类号: E21D11/38 E21D11/40

    CPC分类号: E21D11/383 E21D11/40

    摘要: Die Erfindung betrifft ein Verfahren zum temporären Anbringen einer Dichtungsbahn (12) aus thermoplastischen Kunststoff in einem Tunnelgewölbe, dessen Tunnelwandung (11) mit einer Schicht aus geotextilem Material, insbesondere einem geotextilem Vlies, versehen ist, wobei die Dichtungsbahn abschnittsweise und in Umfangsrichtung des Tunnelgewölbes an die Tunnelwandung gelegt wird. Es wird vorgeschlagen, dass die Dichtungsbahn auf ihrer der Tunnelwandung zugekehrten Seite (25) zumindest bereichsweise mit einer Haftfolie (26) beschichtet wird, dass die Dichtungsbahn (12) vor dem Anlegen an die geotextile Schicht (24) zumindest im Bereich der Haftfolie erhitzt wird, so dass die Haftfolie zumindest teilweise plastifiziert wird, und dass die Dichtungsbahn mit der plastifizierten Haftfolie an die Wand gedrückt wird. Auch betrifft die Erfindung eine Dichtungsbahn zum Durchführen des Verfahrens.

    摘要翻译: 该方法包括将具有形成的聚丙烯塑料土工织物层的聚乙烯塑料密封片(12)隧道壁(11)的圆周方向上。 带有粘接膜的被涂覆在隧道面对的密封片材的一侧。 所以DASS死粘接膜的被塑化的粘合剂膜被隧道壁的土工布层上的密封片材的应用之前被加热。 涂有塑化粘合剂密封片薄膜固定在隧道壁由单独的固定装置(14)。

    ROCK-BOLTING APPARATUS AND METHOD
    8.
    发明公开
    ROCK-BOLTING APPARATUS AND METHOD 审中-公开
    VORRICHTUNG UND VERFAHREN ZUM SETZEN VON GEBIRGSANKERN

    公开(公告)号:EP1407114A4

    公开(公告)日:2006-06-28

    申请号:EP02729659

    申请日:2002-06-18

    摘要: An articulated boom arm for a rock boring machine, comprising a first kinked member having a drill guide at one end and a base pivot at the other end, and a pair of pivoted links. One of said links having a first end pivoted at said base pivot, the other of the links having a drill pivotally mounted at a first end thereof. The second ends of the first and second links being pivoted to each other whereby said drill is reciprocally linearly movable along said first member with a drill bit aligned with said drill guide and at one extremity of the reciprocal movement both said pair of links are substantially longitudinally aligned and extend towards said drill guide, and at the other extremity of the reciprocal movement both said pair of links are substantially longitudinally aligned and extend away from said drill guide.

    摘要翻译: 一种用于岩石钻孔机的铰接臂臂,包括第一扭结构件和一对枢转连杆,所述第一扭结构件在一端处具有钻孔引导件并且在另一端处具有基部枢轴。 所述连杆中的一个具有在所述基座枢轴处枢转的第一端,所述连杆中的另一个具有可枢转地安装在其第一端处的钻头。 第一和第二连杆的第二端彼此枢转,由此所述钻头沿着所述第一构件可往复地线性移动,其中钻头与所述钻具导向器对齐,并且在往复运动的一个末端处,所述一对连杆均基本上纵向地 对齐并朝向所述钻引导件延伸,并且在往复运动的另一末端处,所述一对连接件均基本上纵向对齐并远离所述钻引导件延伸。

    GUIDING MEANS FOR INSTALLATION OF FORMED- i IN-SITU /i CONDUIT REPAIRS
    9.
    发明公开
    GUIDING MEANS FOR INSTALLATION OF FORMED- i IN-SITU /i CONDUIT REPAIRS 审中-公开
    资源用于现场MANUFACTURED在线修复安装

    公开(公告)号:EP1514050A1

    公开(公告)日:2005-03-16

    申请号:EP03759788.7

    申请日:2003-06-17

    CPC分类号: F16L55/1652 F16L55/1651

    摘要: Method and apparatus for guiding an everting form (1) employed to carry formed-in-situ repair material into a pipe (2) or conduit comprising passing guiding means (3) through the interior and along the full length of said everting form in its un-everted state; fixing a first end of said guiding means to a substantially closed end of said everting form; attaching said guiding means (3) in a readily detachable way to the interior surfaces of said everting form and said repair material substantially throughout the length of said everting form; and, during eversion of said everting form, applying tension to said guiding means to assist in guiding the transition of the zone of eversion through directional changes and discontinuities in said pipe or conduit (2) and prevent localised axial differential movement between said everting form (1)and said repair material immediately upstream of said zone of eversion.

    Vorrichtung zur Montage von Tunnelauskleidungselementen

    公开(公告)号:EP1191187A2

    公开(公告)日:2002-03-27

    申请号:EP01122173.6

    申请日:2001-09-15

    申请人: Hentschel, Volker

    发明人: Hentschel, Volker

    IPC分类号: E21D11/40

    CPC分类号: E21D11/403

    摘要: Es wird ein Erektor zur Montage von Tübbingen beim Tunnelausbau beschrieben.
    Auf einer am Grundkörper einer Vortriebsmaschine abgestützten Basis befindet sich ein Schwerlastmanipulator, der bezogen auf die Basis mehrachsig verfahrbar ist und eine Greifvorrichtung für die Tübbinge trägt. Der Schwerlastmanipulator umfasst eine Plattform, die mit der Basis über wenigstens sechs schräge und längenverstellbare Streben raumgelenkig verbunden ist. Auf der Plattform ist ein Rotor angeordnet ist, der seinerseits einen längenverstellbaren Kragarm trägt. Am Ende des Kragarms ist die Greifvorrichtung angeordnet. Die längenverstellbaren Streben, der Rotor, der längenverstellbare Kragarm und die Greifvorrichtung sind über Antriebe betätigbar.

    摘要翻译: 基座(20)支撑在基体(12)或驱动机器(10)上或预组装的滚筒环上。 重载操纵器(22)定位在基座上,并承载用于管道(34)的夹持器(32)。 重载操纵器具有通过至少六个倾斜和长度可调节的支柱(26)连接到基座的平台(24)。 平台支撑可支撑长度可调的悬臂(30)的转子(28)。 长度可调的支柱,转子,长度可调的悬臂和夹具都由驱动机构操作。