摘要:
A first transport trolley 12 on which a first pipe 11 is loaded and a second transport trolley 15 on which a second pipe 14 is loaded are moved forward and one end 19 of the first pipe 11 is joined to the other end 20 of the rearmost pipe 4 in a pipeline 2; the other end 20 of the first pipe 11 is lifted; the first transport trolley 12 and the second transport trolley 15 are moved back and the first transport trolley 12 is removed to the front side from under the first pipe 11; a connection member 28 is removed and the first transport trolley 12 and the second transport trolley 15 are separated; the first transport trolley 12 is moved back and pulled in under the second pipe 14 that is loaded on the second transport trolley 15; the second transport trolley 15 is moved forward with the first transport trolley 12 and the one end 19 of the second pipe 14 on the second transport trolley 15 is joined to the other end 20 of the first pipe 11 that is joined to the rearmost pipe 4.
摘要:
L'invention concerne une remorque (10) d'un train suiveur (3) d'un tunnelier (1) comprenant : - des moyens de roulement (11) configurés pour permettre un déplacement de la remorque (10) sur une voie de circulation (5), - un châssis (20) comportant une partie inférieure (21) comprenant les moyens de roulement (11) et une partie supérieure (26), opposée aux moyens de roulement (11), - des moyens de convoyage (30), fixés dans la partie inférieure (21) du châssis (20), lesdits moyens de convoyage (30) étant configurés pour déplacer au moins un support (40) le long de la remorque (20), ledit support étant configuré pour transporter au moins un voussoir (70) le long du châssis (20).
摘要:
Schild (400) für eine Tunnelbohrmaschine (100) zum Bohren eines Bohrlochs (104) in einem Gebirge (102), wobei das Schild (400) ein Schildrohr (118) zum Schützen eines Abschnitts der Tunnelbohrmaschine (100) vor sich von einer Bohrlochwandung lösendem Gebirgematerial, wobei das Schildrohr (118) vorübergehend zwischen einem zu verlegenden Tübbing (112) zum Auskleiden der Bohrlochwandung einerseits und der Bohrlochwandung andererseits anzuordnen ist, und einen an und/oder in dem Schildrohr (118) angeordneten Sensor (116) zum Detektieren einer für einen Abstand zwischen dem Schildrohr (118) und dem zu verlegenden Tübbing (112) indikativen Information aufweist.
摘要:
Die Erfindung betrifft ein Verfahren zum temporären Anbringen einer Dichtungsbahn (12) aus thermoplastischen Kunststoff in einem Tunnelgewölbe, dessen Tunnelwandung (11) mit einer Schicht aus geotextilem Material, insbesondere einem geotextilem Vlies, versehen ist, wobei die Dichtungsbahn abschnittsweise und in Umfangsrichtung des Tunnelgewölbes an die Tunnelwandung gelegt wird. Es wird vorgeschlagen, dass die Dichtungsbahn auf ihrer der Tunnelwandung zugekehrten Seite (25) zumindest bereichsweise mit einer Haftfolie (26) beschichtet wird, dass die Dichtungsbahn (12) vor dem Anlegen an die geotextile Schicht (24) zumindest im Bereich der Haftfolie erhitzt wird, so dass die Haftfolie zumindest teilweise plastifiziert wird, und dass die Dichtungsbahn mit der plastifizierten Haftfolie an die Wand gedrückt wird. Auch betrifft die Erfindung eine Dichtungsbahn zum Durchführen des Verfahrens.
摘要:
An articulated boom arm for a rock boring machine, comprising a first kinked member having a drill guide at one end and a base pivot at the other end, and a pair of pivoted links. One of said links having a first end pivoted at said base pivot, the other of the links having a drill pivotally mounted at a first end thereof. The second ends of the first and second links being pivoted to each other whereby said drill is reciprocally linearly movable along said first member with a drill bit aligned with said drill guide and at one extremity of the reciprocal movement both said pair of links are substantially longitudinally aligned and extend towards said drill guide, and at the other extremity of the reciprocal movement both said pair of links are substantially longitudinally aligned and extend away from said drill guide.
摘要:
Method and apparatus for guiding an everting form (1) employed to carry formed-in-situ repair material into a pipe (2) or conduit comprising passing guiding means (3) through the interior and along the full length of said everting form in its un-everted state; fixing a first end of said guiding means to a substantially closed end of said everting form; attaching said guiding means (3) in a readily detachable way to the interior surfaces of said everting form and said repair material substantially throughout the length of said everting form; and, during eversion of said everting form, applying tension to said guiding means to assist in guiding the transition of the zone of eversion through directional changes and discontinuities in said pipe or conduit (2) and prevent localised axial differential movement between said everting form (1)and said repair material immediately upstream of said zone of eversion.
摘要:
Es wird ein Erektor zur Montage von Tübbingen beim Tunnelausbau beschrieben. Auf einer am Grundkörper einer Vortriebsmaschine abgestützten Basis befindet sich ein Schwerlastmanipulator, der bezogen auf die Basis mehrachsig verfahrbar ist und eine Greifvorrichtung für die Tübbinge trägt. Der Schwerlastmanipulator umfasst eine Plattform, die mit der Basis über wenigstens sechs schräge und längenverstellbare Streben raumgelenkig verbunden ist. Auf der Plattform ist ein Rotor angeordnet ist, der seinerseits einen längenverstellbaren Kragarm trägt. Am Ende des Kragarms ist die Greifvorrichtung angeordnet. Die längenverstellbaren Streben, der Rotor, der längenverstellbare Kragarm und die Greifvorrichtung sind über Antriebe betätigbar.