Damping control device, damping control method, and computer program
    43.
    发明专利
    Damping control device, damping control method, and computer program 有权
    阻尼控制装置,阻尼控制方法和计算机程序

    公开(公告)号:JP2012223775A

    公开(公告)日:2012-11-15

    申请号:JP2011090831

    申请日:2011-04-15

    摘要: PROBLEM TO BE SOLVED: To provide a damping control device capable of identifying an optimal control gain at a real time and applying the optimal gain in operation.SOLUTION: The damping control device includes a controller for controlling a damping device which can restrain vibrations in directions orthogonal to a conveying direction of belt-shaped metal plates conveyed continuously and approximately perpendicular to the plate surface of the metal plate, and an information processing device for changing the control gain by identifying the control gain of the controller. The information processing device includes: a data acquisition section for acquiring displacement result values of the metal plate detected with a detecting device for detecting in a direction orthogonal to a conveying direction of the metal plates and operation actual values of the damping device; a control gain identification section for identifying the control gain of the controller by using a control model of the damping device on the basis of displacement actual values and operation actual values; and a control gain change section for changing the control gain of the controller at designated timing on the basis of the identified control gain.

    摘要翻译: 要解决的问题:提供能够实时识别最佳控制增益并在运行中应用最佳增益的阻尼控制装置。 解决方案:阻尼控制装置包括用于控制阻尼装置的控制器,该阻尼装置可以抑制沿与金属板的板表面连续输送的带状金属板的输送方向正交的方向上的振动, 信息处理装置,用于通过识别控制器的控制增益来改变控制增益。 信息处理装置包括:数据获取部,用于获取用与用于检测金属板的输送方向正交的方向的检测装置检测出的金属板的位移结果值和阻尼装置的操作实际值; 控制增益识别部分,用于基于位移实际值和操作实际值通过使用阻尼装置的控制模型来识别控制器的控制增益; 以及控制增益改变部分,用于根据所识别的控制增益在指定的定时改变控制器的控制增益。 版权所有(C)2013,JPO&INPIT

    Method of manufacturing a cold-rolled steel sheet

    公开(公告)号:JP5050796B2

    公开(公告)日:2012-10-17

    申请号:JP2007296592

    申请日:2007-11-15

    发明人: 芳郎 鷲北

    摘要: PROBLEM TO BE SOLVED: To manufacture a cold-rolled steel sheet without reaching suspension of pickling even while a cold-rolling mill is suspended without impeding productivity needlessly in continuous steel sheet processing equipment. SOLUTION: Before suspending a cold-rolling mill 5, the target value of the sum total of the accumulative length of loopers 12, 13 when ending the suspension of the cold-rolling mill 5 arranged between sections 24, 26 and a threading speed during the suspension of the cold-rolling mill 5 in the section 24 are determined, the target value of the sum total of the accumulative length of the loopers 12, 13 when starting the suspension of the cold-rolling mill 5 is obtained on the basis of the predetermined suspension time of the cold-rolling mill 5, the target value of the accumulative length of the steel sheet when ending the suspension of the cold-rolling mill 5 and the threading speed during the suspension of the cold-rolling mill 5 of the section 24. By controlling the threading speed of the section 24 so as to satisfy the target value of the sum total of the accumulative length when starting the suspension of the cold-rolling mill 5, after starting the suspension of the cold-rolling mill 5, the threading speed of the section 24 is used as the threading speed during the suspension of the cold-rolling mill 5 determined before the suspension of the cold-rolling mill 5. COPYRIGHT: (C)2009,JPO&INPIT

    Conveyance control method for rolled material in hot rolling line
    46.
    发明专利
    Conveyance control method for rolled material in hot rolling line 有权
    热轧卷材轧制材料的输送控制方法

    公开(公告)号:JP2012166243A

    公开(公告)日:2012-09-06

    申请号:JP2011030188

    申请日:2011-02-15

    IPC分类号: B21B37/00 B21B39/00

    摘要: PROBLEM TO BE SOLVED: To provide a conveyance control method for a rolled material in a hot rolling line capable of minimizing the idling time between rolled materials at an inlet side of a finishing rolling mill even though errors on the rolling time may be generated in a rough rolling mill.SOLUTION: When errors at the actual rolling time are generated on material rolling starting and terminating times of respective stands R1 to R3 set at the time of sampling in a heating furnace 1, the pitch can be corrected by changing the conveyance speed of conveyance tables among the stands R1 to R3 so as to make next stand R2 or R3 located at a downstream side start its rolling at an originally set time.

    摘要翻译: 要解决的问题:为了提供一种能够最小化精轧机的入口侧的轧制材料之间的怠速时间的热轧生产线中的轧制材料的输送控制方法,即使轧制时间的误差可能为 在粗轧机中产生。 解决方案:当在加热炉1中取样时设定的各台架R1〜R3的材料轧制开始和终止时间产生实际轧制时间的误差时,可以通过改变加热炉1的采样时间 台架R1〜R3之间的输送台在下一侧的下一侧R2或R3在原来的设定时间开始滚动。 版权所有(C)2012,JPO&INPIT

    Steel plate levelling speed control method on levelling machine and its equipment
    47.
    发明专利
    Steel plate levelling speed control method on levelling machine and its equipment 审中-公开
    水平机械及其设备的钢板调速控制方法

    公开(公告)号:JP2012161832A

    公开(公告)日:2012-08-30

    申请号:JP2011025862

    申请日:2011-02-09

    IPC分类号: B21D1/05 B21B39/00

    摘要: PROBLEM TO BE SOLVED: To provide a steel plate levelling speed control method on a levelling machine and its equipment, which can improve manufacturing efficiency of the steel plate by avoiding collision of the tail end of a preceding steel piece with the head end of a following steel piece, and can eventually improve productivity.SOLUTION: When a plurality of steel plates cooled to a designated temperature on a cooling bed 1 are successively straightened through a levelling machine 2 and when a steel plate on a transfer table on the entry side of the levelling machine is drawn in beneath the work roll of levelling machine 2 for straightening with no steel plate in the levelling machine, if the space Lb on the delivery side of the levelling machine is longer than the length of steel plate that is assumed to be drawn in and straightened, straightening on the levelling machine 2 is performed at the predetermined standard speed for straightening, and if the space Lb on the delivery side of the levelling machine is shorter than the length of steel plate that is assumed to be drawn in and straightened, straightening on the levelling machine 2 is performed at a slower speed than the standard speed for straightening, and furthermore, the shorter is the space Lb on the delivery side of the levelling machine, the slower is the straightening speed.

    摘要翻译: 要解决的问题:为了在调平机及其设备上提供钢板调平速度控制方法,其可以通过避免前一个钢片的尾端与头端的碰撞来提高钢板的制造效率 的下一个钢件,最终可以提高生产率。 解决方案:当在冷却床1上冷却到指定温度的多个钢板通过调平机2连续矫直时,并且当在整平机入口侧的转台上的钢板被拉下 整平机2的工作辊在整平机中无钢板矫直,如果整平机出口侧的空间Lb长于假定被拉伸和拉直的钢板长度, 校平机2以规定的标准速度进行矫正,如果整平机的出口侧的空间Lb短于假定被拉伸并矫直的钢板的长度,则在整平机上矫直 2以比用于校直的标准速度慢的速度进行,此外,流平机的输送侧的空间Lb越短,慢 呃是矫直速度。 版权所有(C)2012,JPO&INPIT