公开(公告)号:KR1020140110526A
公开(公告)日:2014-09-17
申请号:KR1020130025025
申请日:2013-03-08
IPC分类号: E02D29/045 , F16B37/00 , E02D5/06 , E02D29/02
CPC分类号: E02D29/045 , E02D5/06 , E02D29/0275 , E02D2250/0007 , E02D2300/002 , E02D2300/0025 , F16B37/00
摘要: The present invention is to provide a fixing coupler used for a burial slab of an outer wall of underground construction and a construction method of the burial slab using the same. The fixing coupler (12) to achieve the purpose is configured to comprise: a pair of L-shaped steel (12-1) which is disposed at a predetermined interval; a penetrated hole (12-4) which is formed in the L-shaped steel at a predetermined interval; a steel rod (12-2) which is inserted in the penetrated hole, wherein the steel rod is respectively mounted so as to be protruded by a predetermined length from the penetrated hole of the L-shaped steel and both ends of the steel rod is fastened with a nut (12-3) formed with threads; and the pair of L-shaped steel (12-1) to be connected by the steel rod (12-2).
摘要翻译: 本发明提供一种用于地下建筑外壁埋地板的固定连接器及其使用方法。 实现该目的的固定联接器(12)构造成包括:以预定间隔设置的一对L形钢(12-1); 穿过孔(12-4),其以预定间隔形成在L形钢中; 插入穿透孔中的钢杆(12-2),其中钢杆分别安装成从L形钢的穿透孔突出预定长度,钢杆的两端为 用形成螺纹的螺母(12-3)紧固; 和由钢棒(12-2)连接的一对L形钢(12-1)。
-
公开(公告)号:KR1020140017381A
公开(公告)日:2014-02-11
申请号:KR1020120084428
申请日:2012-08-01
CPC分类号: E02D27/28 , E02D5/80 , E02D27/08 , E02D2250/003
摘要: The purpose of the present invention is to provide a method for reinforcing a foundation structure using a micro pile, wherein the method is to simplify the reinforced structure of foundation concrete in order to easily reinforce the foundation structure; to form a drilled hole in order to minimize a cross-sectional loss; to stably support the bottom of the foundation concrete as much as a predetermined width; to prevent the generation of pile punching shear due to the installation of the micro pile; and to allow the foundation concrete to integrally behave with reinforcing concrete when a displacement is generated in the ground. To accomplish the purpose, the method comprises: a step of forming the drilled hole (12b) with a small diameter from the upper surface of the reinforced part of the foundation concrete (10) to the lower surface of the reinforced part of the foundation concrete (10) in order to install the micro pile; a step of forming a drilled hole (12a) with a large diameter and a larger width than the width of the drilled hole (12b) at the lower side of the drilled hole (12b) and in the ground (24) as much as a predetermined depth in order to install a concrete bulb supporting the bottom of the foundation concrete (10) as much as the predetermined width; a step of installing a hollow circular casing (23) at the bottom of the drilled hole (12a) and in the ground as much as a predetermined depth in order to install the micro pile (22); a step of sequentially fastening a lock nut (21), a base plate (20), and a lock nut (21) to the male-threaded outer circumferential surface of the micro pile (22), and installing the micro pile (22) in the casing (23); and a step of filling the reinforcing concrete in the drilled holes.
摘要翻译: 本发明的目的是提供一种使用微桩加强基础结构的方法,其中该方法是简化基础混凝土的加强结构,以便容易地加强基础结构; 以形成钻孔,以最小化横截面损失; 稳定地支撑基础混凝土的底部尽可能多的预定宽度; 防止由于安装微桩而产生桩冲剪; 并允许地基混凝土在地面产生位移时与加固混凝土一体地表现。 为了实现该目的,该方法包括:从基础混凝土(10)的增强部分的上表面到基础混凝土的加强部分的下表面形成具有小直径的钻孔(12b)的步骤 (10)安装微桩; 在钻孔(12b)的下侧和地面(24)中形成具有比钻孔(12b)的宽度大的直径和宽度大的钻孔(12a)的步骤, 预定深度,以便安装一个支撑基础混凝土(10)底部的混凝土灯泡达预定宽度; 为了安装微型桩(22),在钻孔(12a)的底部和地面上安装中空圆形壳体(23)至多达预定深度的步骤; 将锁紧螺母(21),基板(20)和锁定螺母(21)顺序地紧固到微型桩(22)的外螺纹外周面的步骤,并安装微型桩(22) 在壳体(23)中; 以及将加强混凝土填充在钻孔中的步骤。
-
公开(公告)号:KR1020090109678A
公开(公告)日:2009-10-21
申请号:KR1020080035044
申请日:2008-04-16
IPC分类号: E02D29/045 , E21D9/04
CPC分类号: E02D29/045 , E02D2250/0069 , E02D2300/0029 , E21D9/04
摘要: PURPOSE: An iron frame top-down construction system is provided to improve a pin connection for underground layer. CONSTITUTION: An iron frame top-down construction system comprises a CFT post(10). The CFT post includes a backing girder(20). A backing girder comprises a floor framework of a terrestrial first floor and a floor framework of a basement floor. The backing girder supports a step and a slab for constructing a form structure. The CFT posts are connected by bolting the backing girder to a connecting plate with a pin connection mode.
摘要翻译: 目的:提供一种铁框架自顶向下构造系统,以改善地下层的销连接。 构成:铁架自顶向下构造系统包括一个CFT柱(10)。 CFT岗位包括支撑梁(20)。 背衬梁包括地面一楼的地板框架和地下室底板的地板框架。 支撑梁支撑一个步骤和一个用于构造一个窗体结构的平板。 CFT柱通过将衬垫梁连接到具有针连接模式的连接板来连接。
-
公开(公告)号:KR100837831B1
公开(公告)日:2008-06-13
申请号:KR1020070031195
申请日:2007-03-30
IPC分类号: E02D29/045 , E04G11/50 , E04G13/04 , E04C5/16 , E04G17/00
CPC分类号: E02D29/045 , E04C5/168 , E04G11/50 , E04G13/04 , E04G17/00
摘要: An underground NSTD(non supporting top down) system is provided to prevent a lower steel plate from being bent and to improve safety even though a structure supporting a deck not supports a welding part between a trust reinforcing bar and a lower steel plate of a deck. An underground NSTD(non supporting top down) system comprises a supporting girder, a beam mold(20), a deck(31), joists(21), and a deck holding structure(25). The supporting girder is installed at a frame column and supported by a bracket. The beam mold is supported by the supporting girder. The dick is supported by the beam mold. The joists is aligned at the very bottom of the beam mold and extended to two side parts of the beam mold. The deck holding structure is installed at an extension part of the joists along longitudinal direction of the beam. The deck holding structure supports a lower steel plate of the deck from two side parts of the beam mold. A holding square bar is lengthily aligned above two ends of the joists along longitudinal direction of the beam to support the deck.
摘要翻译: 提供地下NSTD(非支撑自顶向下)系统以防止下钢板弯曲并提高安全性,即使支撑甲板的结构不支撑甲板之间的信任钢筋和下钢板之间的焊接部分 。 一个地下NSTD(非支撑自顶向下)系统包括支撑梁,梁模具(20),甲板(31),托梁(21)和甲板保持结构(25)。 支撑梁安装在框架柱上,由支架支撑。 梁模具由支撑梁支撑。 鸡巴由梁模支撑。 托梁在梁模的最底部对齐并延伸到梁模的两个侧面部分。 甲板保持结构沿着梁的纵向安装在托梁的延伸部分处。 甲板保持结构从梁模具的两个侧面部分支撑甲板的下部钢板。 保持方形杆沿着梁的纵向方向在托梁的两端长度对齐以支撑甲板。
-
公开(公告)号:KR1020070013680A
公开(公告)日:2007-01-31
申请号:KR1020050068193
申请日:2005-07-27
IPC分类号: E02D29/045 , E02D17/04
CPC分类号: E02D29/045 , E02D17/04 , E02D2250/0023
摘要: A top-down construction method utilizing a bracket-supported temporary structure as a work table is provided to improve safety, utilization, and economic efficiency. A top-down construction method utilizing a bracket-supported temporary structure(130) as a work table, for top-down constructing a beam and a slab of a basement floor, comprises the steps of constructing an H-shape steel pillar(2) inside a retainer wall after constructing the retainer wall, fixing a supporting bracket(110) to the H-shape steel pillar being exposed after first excavation and mounting a supporting girder(121a,121b) between the two supporting brackets and between the supporting bracket and the retainer wall, mounting and supporting a temporary structure to the supporting girder, mounting a slab mold and a beam mold using the temporary structure as a work table and casting concrete to construct first-floor slab and beam, remounting the respective supporting brackets after second excavation, remounting the supporting girder and the temporary structure on the supporting bracket, constructing basement slab and beam, and constructing slab and beam of lower basement floors downward by repeating the above steps.
摘要翻译: 提供了一种利用支架式临时结构作为工作台的自顶向下的施工方法,以提高安全性,使用性和经济性。 利用托架支撑的临时结构(130)作为工作台的自顶向下施工方法,用于自顶向下构造地下室的梁和板坯,包括以下步骤:构造H型钢柱(2) 在构造保持器壁之后的保持器壁内部,将支撑托架(110)固定在第一次挖掘之后露出的H形钢柱体上,并且将支撑梁(121a,121b)安装在两个支撑托架之间以及在支撑托架和 固定墙,将临时结构安装支撑在支撑梁上,使用临时结构安装平板模具和梁模具作为工作台和浇注混凝土,以构造一楼板坯和梁,再次安装相应的支撑托架 挖掘,重新安装支撑架上的支撑梁和临时结构,建造地下室和梁,并建造下层地下室的板梁和梁 病房通过重复上述步骤。
-
公开(公告)号:KR100614794B1
公开(公告)日:2006-08-22
申请号:KR1020040109173
申请日:2004-12-21
IPC分类号: E04B1/14
摘要: 본 발명은 1개층 또는 2개층을 건너뛰는 시공방식을 채택한 새로운 건축공법에 관한 것이다.
본 발명은 고층 콘크리트 건물의 콘크리트/철골 구조물 구축시 1개층 또는 2개층을 건너뛰는 시공방식을 채택하여 거푸집 설치, 철근조립, 콘크리트 타설 및 양생 등의 작업을 적어도 2개층 이상에서 동시에 수행할 수 있도록 함으로써, 인력과 자재의 투입 및 운영을 효율적으로 할 수 있고, 특히 공사기간을 30%에서 최고 50%까지 단축할 수 있으며, 궁극적으로 건축공사관리비 및 금융비용을 대폭 절감할 수 있는 새로운 건축공법을 제공한다.
고층 콘크리트 건물, 콘크리트/철골 구조물, 스킵공법, 공기단축-
公开(公告)号:KR200368924Y1
公开(公告)日:2004-12-03
申请号:KR2020040026438
申请日:2004-09-15
IPC分类号: E04B5/40
摘要: 본 고안은 횡좌굴 방지용 데크 플레이트에 관한 것으로서, 평판형 데크 플레이트에 있어서, 콘크리트 타설 시공후, 전후 길이방향을 따라 수직 배치된 돌출 형상으로 이루어진 직각 절곡부에 대한 횡구속력이 제대로 발휘되도록 하기 위하여 상기 직각 절곡부의 수평면을 구속할 수 있는 여러 형태의 보강 구조물을 데크 플레이트의 상측 폭방향에 걸쳐 설치 시공함으로써, 상기 데크 플레이트의 단면 성능의 저감을 방지하여 처짐 및 휨 모멘트에 대한 저항을 증가시키게 됨에 따라 궁극적으로 원활한 데크 슬래브 시공이 가능하도록 하는 횡좌굴 방지용 데크 플레이트에 관한 것이다.
-
公开(公告)号:KR200368256Y1
公开(公告)日:2004-11-18
申请号:KR2020040024859
申请日:2004-08-31
IPC分类号: E04B5/40
摘要: 본 고안은 베이스부재와 트러스부재의 접착구조를 포함하는 플랫 슬래브/플랫 플레이트 슬래브용 데크 플레이트와 데크 플레이트의 길이방향 연결구조에 관한 것이다.
본 고안은 베이스부재와 트러스부재의 결합시 용접대신에 접착제를 사용하여 결합함으로써, 부식문제를 완전히 해결하고 제작시 작업성을 현저하게 향상시킬 수 있는 한편, 별도의 길이방향 연결부재를 구비하여 데크 플레이트 간의 길이방향 연결을 가능하게 함으로써, 플랫 슬래브나 플랫 플레이트 슬래브 시공시 데크 플레이트를 적용하여 시공할 수 있는 데크 플레이트와 이것의 연결구조를 제공한다.-
公开(公告)号:KR200362177Y1
公开(公告)日:2004-09-16
申请号:KR2020040016648
申请日:2004-06-14
IPC分类号: E04G23/02
CPC分类号: E04C3/02 , E04C3/04 , E04C2003/026
摘要: 본 고안은 역타공법 지하구조물 시공시 H-형강 철골기둥에 버팀가새(Knee brace)를 보강하여 허용축하중을 높여줄 수 있도록 함으로써, 강재량 절감이 가능하여 경제적인 설계를 할 수 있는 H-형강 철골기둥의 보강구조에 관한 것이다.
본 고안은 기둥의 약축방향에 버팀가새(Knee brace)를 설치하여 약축방향의 좌굴길이를 일정부분 감소시켜 줌으로써, 기둥의 허용축하중을 50∼70% 정도 향상시킬 수 있으며, 이에 따라 많은 양의 강재절감이 가능하여 기둥의 경제적인 설계가 가능하고, 또 설치 및 해체가 용이한 착탈식 버팀가새를 사용하여 재사용 및 재시공을 수월하게 할 수 있도록 함으로써, 경제적이고 효율적인 시공을 가능하게 한 H-형강 철골기둥의 보강구조를 제공한다.-
公开(公告)号:KR200353351Y1
公开(公告)日:2004-06-17
申请号:KR2020040008297
申请日:2004-03-25
申请人: 황기수
发明人: 황기수
IPC分类号: G09F19/22
摘要: 본 고안은 화재발생이나 정전 등의 위급한 상황에서 사람들을 안전에게 유도하기 위한 비상유도장치에 관한 것으로써, 보다 상세하게는 지하철이나 건물 등의 내부에 설치되어 비상구 또는 출구의 위치를 표시하기 위한 발광다이오드(LED)가 비상구나 출구방향으로 순차적인 릴레이식으로 점멸되도록 설계되어져 있으며, 내부에 충전용 콘덴서를 사용하여 전원공급이 중단되어도 일정시간 동작하여 사람들에게 위치와 방향을 알려줄 수 있는 비상유도장치에 관한 것이다.
摘要翻译: 本发明提供了一种在火灾或电力中断等紧急情况下引导人们的应急引导系统。 更具体地说,本发明的应急引导系统被安装在地铁站或建筑物中,并被设计为使得多个发光二极管(LED)(7)在出口方向上依次闪烁。 此外,本发明包括充电电容器(8)。 因此,即使电力中断,应急引导系统也可以运行预定时间,由此向人们指示期望位置的方向。
-
-
-
-
-
-
-
-
-