-
公开(公告)号:KR1020140013755A
公开(公告)日:2014-02-05
申请号:KR1020120082122
申请日:2012-07-27
申请人: 제이에프이 스틸 가부시키가이샤
摘要: Provided is a hat-type steel sheet pile of which the economic feasibility, the constructability, and the integrity are optimized. The hat-type steel sheet pile according to the present invention comprises: an upper flange part; web parts consecutively formed at both ends of the upper flange part; and lower flange parts formed at the respective end portions of a pair of the web parts. When a steel sheet pile wall is completed by the hat-type steel sheet pile, relations between a geometric second moment per meter (I cm^4/m) in the width of the wall, a weight (W kg/m^2) per the area of unit wall, and a penetration resistance (R) and a web angle (θ°) are determined to satisfy one of a formula group (A) or a formula group (B) below. The formula group (A) includes: (W/I) * R
摘要翻译: 提供了经济可行性,可构造性和完整性的帽型钢板桩。 根据本发明的帽型钢板桩包括:上凸缘部; 腹板部分连续地形成在上凸缘部分的两端; 以及形成在一对腹板部的各个端部的下凸缘部。 当由帽型钢板桩完成钢板桩墙时,墙壁宽度的每米几何二次矩(I cm ^ 4 / m)与重量(W kg / m ^ 2)之间的关系, 单位面积的面积,并且穿透阻力(R)和腹板角度(θ°)被确定为满足下面的式(A)或式(B)组中的一个。 式(A)式包括:(W / I)* R <= 0.04; 2.65 *(10 ^ -4)*(I + 22)<=θ<= 2.80 *(10 ^ -4)*(I + 48)其中20000 <= I 80000; 和2.65 *(10 ^ -4)*(I + 22)<=θ<= 70,其中80000 <= I <180000,式组(B)包括:0.004 <(W / I)* R < 0.0075; 2.80 *(10 ^ -4)*(I + 44.6)<θ<= 80,其中20000 <= I 80000; 和67 <θ<= 80,其中80000 <= I <200000。
-
公开(公告)号:KR1020130060762A
公开(公告)日:2013-06-10
申请号:KR1020110126992
申请日:2011-11-30
申请人: 김만진
发明人: 김만진
摘要: PURPOSE: A jig for connecting a steel pipe is provided to prevent separation by accurately performing welding by widening a welding space unit. CONSTITUTION: A jig(10) for connecting a steel pipe(1) comprises a hanging loop unit(12) and a connection unit. The connection unit comprises a bottom surface of a slow curve radius in order to be attached to a surface of the steel pipe. A welding unit(11c) forms a welding space unit(11b) by being upwardly extended from both ends of the bottom surface. A waterproofing material coating surface is formed inside. The inside of the hanging loop unit forms a flat surface(12a), and the outside is slopingly extended from the connection unit.
摘要翻译: 目的:提供用于连接钢管的夹具,以通过加宽焊接空间单元来精确地执行焊接来防止分离。 构成:用于连接钢管(1)的夹具(10)包括吊环单元(12)和连接单元。 连接单元包括缓慢曲率半径的底面,以便附接到钢管的表面。 焊接单元(11c)通过从底面的两端向上延伸而形成焊接空间单元(11b)。 内部形成防水材料涂层表面。 吊环单元的内部形成平坦表面(12a),并且外部从连接单元倾斜地延伸。
-
公开(公告)号:KR101258451B1
公开(公告)日:2013-04-26
申请号:KR1020110085128
申请日:2011-08-25
申请人: 파일프로 엘엘씨
发明人: 하인들리차드
CPC分类号: E02D5/08 , E02D5/06 , Y10T403/477 , Y10T428/168 , Y10T428/24008
摘要: 본 발명은, 복수의 널말뚝벽(sheet-pile wall), 및 2개의 널말뚝벽(90, 94)을 연결하기 위해 길이방향에서 볼 때 일정한 단면을 가지는 2개 이상의 연결 프로파일(10, 20)의 어셈블리에 관한 것이다. 이 어셈블리(100)에서, 상기 2개의 연결 프로파일 중 제1 프로파일(10)은, 제1 널말뚝벽(90)에 부착되는 베이스, 미리 정해진 방향을 따라 상기 베이스로부터 돌출된 네크 스트립(neck strip), 및 클로 스트립(claw strip)과의 결합을 위해 상기 네크 스트립의 자유 단부에 구비된 커다란 단면의 헤드 스트립(head strip)을 포함하며, 상기 클로 스트립은 상기 헤드 스트립을 부분적으로 둘러싼다. 상기 2개의 연결 프로파일 중 제2 프로파일(20)은, 제2 널말뚝벽(90)에 부착되는 베이스, 및 헤드 스트립을 체결하기 위한 클로 스트립을 포함한다. 상기 제1 연결 프로파일(10)의 헤드 스트립은, 널말뚝(94)의 클로 스트립을 널말뚝벽으로서 체결하고 상기 제2 연결 프로파일(20)의 클로 스트립을 체결하기 위한 역할을 하고, 상기 제2 연결 프로파일(20)의 클로 스트립(26)은, 널말뚝(94)의 헤드 스트립을 널말뚝벽으로서 체결하고 상기 제1 연결 프로파일(10)의 헤드 스트립을 체결하기 위한 역할을 한다.
-
公开(公告)号:KR1020120140506A
公开(公告)日:2012-12-31
申请号:KR1020110060286
申请日:2011-06-21
申请人: 태화강재산업 주식회사 , 황현만
发明人: 황현만
CPC分类号: E02D5/06 , E02D5/08 , E02D7/02 , E02D17/04 , E02D2200/1607 , E02D2300/0017
摘要: PURPOSE: A steel sheet pile wall with a channel type bonding structure and a barrier wall using the same are provided to improve a waterproof function and construct ability as the steel sheet piles are mechanically connected each other and not separated. CONSTITUTION: A steel sheet pile wall comprises a steel pipe(10), an insertion member(11), and a receiving member(12). The insertion member is extended in the longitudinal direction of the steel pipe. The insertion member protrudes on the outer surface of the steel pipe. On the outer surface of the insertion member, a horizontal unit is installed. A first steel rod(13) is formed on the outer surface of the horizontal unit. The receiving member receives the insertion member on the outer surface of the steel pipe. A second steel rod(14) for blocking water is formed in the concave part of the receiving member.
摘要翻译: 目的:提供具有通道型接合结构的钢板桩壁和使用其的阻挡壁,以提高钢板桩彼此机械连接并且不分离的防水功能和构造能力。 构成:钢板桩壁包括钢管(10),插入构件(11)和接收构件(12)。 插入构件沿钢管的长度方向延伸。 插入构件在钢管的外表面上突出。 在插入构件的外表面上安装有水平单元。 第一钢杆(13)形成在水平单元的外表面上。 接收构件在钢管的外表面上接收插入构件。 在接收构件的凹部中形成用于阻挡水的第二钢杆(14)。
-
公开(公告)号:KR2020120006727U
公开(公告)日:2012-10-04
申请号:KR2020110002353
申请日:2011-03-22
申请人: 만수건설(주)
发明人: 이정재
CPC分类号: E02D5/08 , E02D5/24 , E02D5/285 , E02D2300/0029 , E02D2600/20
摘要: 본 고안은, 제1강관파일(10)과 제2강관파일(10')이 동축방향으로 상호 맞대어져 연결되는 강관파일 연결구조에 있어서, 상기 제1강관파일(10)의 외면 상단부에는 내부와 연통되는 구멍(11)이 형성되고, 내주면에는 단턱(12)이 형성되며, 상단부와 하단부에 체결부(21,22)가 형성되고 내주면을 따라 보강용 리브(23)가 형성된 원통형의 연결구(20)가 제1강관파일(10)의 상단 내측으로 삽입되어 단턱(12)에 의해 지지되고, 구멍(11) 및 체결부(21)가 볼트(30)를 매개로 고정되며, 외면 하단부에 구멍(11')이 형성된 제2강관파일(10')이 연결구(20)의 외측으로 삽입되어 제1강관파일(10)의 상면에 얹혀지고, 구멍(11') 및 체결부(22)가 볼트(30)를 매개로 고정되는 것을 특징으로 한다.
본 고안의 실시 예에 따르면, 제1?2강관파일을 연결구를 매개로 상호 연결하기 때문에 용접공정이 필요 없을 뿐만 아니라, 매우 용이하게 제1?2강관파일을 연결할 수 있으며, 나아가, 제1?2강관파일과 연결구가 볼트에 의해 고정되기 때문에 견실한 이음구조를 실현할 수 있다.-
公开(公告)号:KR1020110105099A
公开(公告)日:2011-09-26
申请号:KR1020100024162
申请日:2010-03-18
申请人: 홍지기술산업주식회사 , 박정태
发明人: 박정태
CPC分类号: E02D5/06 , E02D5/08 , E02D17/08 , E02D31/00 , E02D2220/00
摘要: 본 발명은 주케이싱(100)과의 결합을 위한 홈부(210)가 형성되도록 양측면이 오목하게 형성된 본체; 양측면의 심부에 형성된 재천공용 홈(410);을 포함하는 것을 특징으로 하는 차수벽 조인트 구조물(400)을 제시함으로써, 주열식 현장타설 말뚝공법의 장점인 충분한 강도를 확보할 수 있도록 하면서도, 높은 차수 효과를 얻을 수 있도록 한다.
摘要翻译: 本发明的特征在于包括:主体,其具有形成为形成用于与主壳体(100)接合的槽部(210)的凹侧; (410)形成在主体(410)的两侧表面的深部处,从而提供足够的强度,这是主热式现浇桩方法的优点, 这样得到的。
-
公开(公告)号:KR1020110092987A
公开(公告)日:2011-08-18
申请号:KR1020100012738
申请日:2010-02-11
申请人: 하민자
IPC分类号: E21D9/00 , E21D9/04 , E02D29/045 , E02D5/14
摘要: PURPOSE: A boring system and a boring method using the same are provided to improve a water barrier effect between piles by easily performing pile insertion work. CONSTITUTION: A boring system comprises a protrusion member and a guide groove forming member(120). The protrusion member has a protrusion and heads. The heads are extended from both ends of the protrusion. The guide groove forming member comprises a receiving space forming unit(121) and a cut unit(122). The receiving space forming unit forms a receiving space for accepting the heads. The cut unit is formed outside the receiving space to prevent the heads from being deviated from the receiving space.
摘要翻译: 目的:提供一种钻孔系统和使用该钻孔系统的钻孔方法,以通过轻松执行桩插入工作来提高桩之间的防水效果。 构成:镗孔系统包括突出构件和引导槽形成构件(120)。 突出部件具有突起和头部。 头部从突起的两端延伸。 引导槽形成构件包括容纳空间形成单元(121)和切割单元(122)。 接收空间形成单元形成用于接收头部的接收空间。 切割单元形成在接收空间的外侧,以防止头部偏离接收空间。
-
公开(公告)号:KR1020110045495A
公开(公告)日:2011-05-04
申请号:KR1020090102101
申请日:2009-10-27
申请人: 양영신
发明人: 양영신
IPC分类号: E02D5/08 , E02D13/04 , E02D5/74 , E02D29/045
CPC分类号: E02D5/08 , E02D5/74 , E02D13/04 , E02D29/045
摘要: PURPOSE: A sheet pile installation method and a sheet pile installation guide fixing frame are provided to prevent the collapse of the existing bore hole and to install sheet piles at a time after drilling all the positions to install the sheet piles. CONSTITUTION: A sheet pile installation method is as follows. The ground is arranged to be leveled in an area to install N sheet piles(S10). A sheet pile installation guide fixing frame of square shape is installed in the arranged area(S20). The installation position of a first sheet pile is defined in the sheet pile installation guide fixing frame(S30). The ground of the defined first sheet pile installation position is excavated and a casing is inserted to the designated depth(S40). A substitute material is filled inside the casing and the casing is drawn out(S50). The installation position of a third sheet pile is defined in the sheet pile installation guide fixing frame(S60). The ground of the defined third sheet pile installation position is excavated and a casing is inserted to the designated depth(S70). A substitute material is filled inside the casing and the casing is drawn out(S80). The installation position of a second sheet pile is defined in the sheet pile installation guide fixing frame(S90). The ground of the defined second sheet pile installation position is excavated and a casing is inserted to the designated depth(S100).
摘要翻译: 目的:提供板桩安装方法和片桩安装导向固定框架,以防止现有钻孔的塌陷,并在钻取所有位置后安装板桩,以安装板桩。 构成:板桩安装方法如下。 地面布置成在一个区域中平整以安装N张堆垛(S10)。 布置区域安装有方形的片桩安装导向固定框(S20)。 第一片桩的安装位置被限定在片桩安装引导件固定框架中(S30)。 挖掘定义的第一片桩安装位置的地面,并将套管插入指定深度(S40)。 替代材料填充在壳体内部并且外壳被拉出(S50)。 第三片桩的安装位置被限定在片桩安装引导件固定框架(S60)中。 挖掘定义的第三张桩安装位置的地面,并将套管插入指定深度(S70)。 替代材料填充在壳体内部并且外壳被拉出(S80)。 第二片桩的安装位置被限定在片桩安装引导件固定框架中(S90)。 挖掘定义的第二片桩安装位置的地面,并将套管插入指定深度(S100)。
-
公开(公告)号:KR100967652B1
公开(公告)日:2010-07-07
申请号:KR20090047485
申请日:2009-05-29
申请人: KIM EUN HEE , KANG GYI SOOK
发明人: KIM EUN HEE , KANG GYI SOOK
CPC分类号: E02D5/06 , E02D5/08 , E02D2250/0046 , E02D2300/0032
摘要: PURPOSE: A precast composite sheet pile and a method for fabricating the same are provided to improve the endurance of sheet piles installed for water stop or earth retaining without degrading the beautiful appearance. CONSTITUTION: A precast composite sheet pile comprises a sheet pile(1), a shear connector, traverse reinforcing bars, longitudinal reinforcing bars, and a concrete portion(5). The steel sheet pile is made of a steel material and fitted with connectors(1a) on the left and right sides for connection to adjacent sheet pile. The shear connector is provided on the surface of the sheet pile. The traverse reinforcing bars are arranged around the sheet pile in order to surround the shear connector. The longitudinal reinforcing bars are arranged in the direction perpendicular to the transverse reinforcing bars. The concrete portion seals the shear connector, the traverse reinforcing bars, and the longitudinal reinforcing bars.
摘要翻译: 目的:提供一种预制复合片材桩及其制造方法,以提高安装在止水或保持土壤的板桩的耐久性,而不会使外观美观。 构成:预制复合板桩包括板桩(1),剪切连接器,横向加强筋,纵向钢筋和混凝土部分(5)。 钢板桩由钢材制成,并在左侧和右侧装有连接件(1a),用于连接相邻的纸堆。 剪切连接器设置在纸张堆的表面上。 横向加强筋布置在片桩周围,以围绕剪切连接器。 纵向钢筋沿垂直于横向钢筋的方向设置。 混凝土部分密封剪切连接器,横向加强筋和纵向钢筋。
-
公开(公告)号:KR1020080099905A
公开(公告)日:2008-11-14
申请号:KR1020070045778
申请日:2007-05-11
申请人: 주식회사 은성오엔씨
发明人: 은희성
摘要: An integrated cell construction method is provided to improve the precision of construction, to secure the stability of the cell and to improve the convenience. An integrated cell construction method comprises following steps: a first step(S10,S20,S30) making the cell of the integrated having the closed loop it unites a plurality of sheet piles in land; a second step(S40) transporting the integrated cell manufactured by land to resolution; a third step(S50) for setting up the transported cell using the pile driving machine for the location for to setting up the carried cell.
摘要翻译: 提供一种集成电池构造方法,以提高构造精度,确保电池的稳定性和提高便利性。 集成电池构造方法包括以下步骤:第一步骤(S10,S20,S30),使具有闭环的集成电池的单元将多个纸张堆叠在一起; 第二步(S40)将由陆地制造的综合电池运送到分辨率; 第三步骤(S50),用于使用打桩机设置运送的电池,用于设置承载电池的位置。
-
-
-
-
-
-
-
-
-