Abstract:
Exemplary embodiments for configuring a system for monitoring the performance of a control loop of an industrial plant includes reading in first process data derived from measurements of at least one sensor inside the control loop during a specified control situation, calculating from the first process data a corresponding at least one performance index indicating the behaviour of the control loop and determining a first quality of the control performance depending on the difference between the at least one performance index and a corresponding threshold value. In case that the first quality of the control performance is determined to be less than good, a second quality of the control performance is determined either by calculating the second quality from an analysis of second process data or by processing a user input from a user of the system which indicates the second quality.
Abstract:
A production planning system and a system for energy supply planning are configured to determine a production schedule and an energy supply schedule, respectively, by interactively and mutually exchanging scheduling information with the respective other system and by taking the received scheduling information into account during the planning of the respective schedule. The interacting is performed in a kind of handshaking during planning of the respective schedules, where each of the two systems waits with the next iteration step until the other system delivers its updated schedule.