-
1.
公开(公告)号:US20230149988A1
公开(公告)日:2023-05-18
申请号:US17916946
申请日:2021-01-04
Applicant: SHANDONG JIAOTONG UNIVERSITY
Inventor: Jin LI , Enzhou DI , Miaozhang YU , Shen ZUO , Peng JIANG , Xinzhuang CUI
CPC classification number: B09B3/35 , B09B3/40 , B09B2101/65
Abstract: A geogrid prepared by recycling medical waste and a preparation method therefor, and use in foundation reinforcement. The method includes: recycling medical waste for treatment and processing the medical waste into a crushed material; adding modified filler and processing aids, and selecting high-strength fiber bundles for compounding and melting with the crushed material and pressing and stretching to prepare a geogrid. The medical waste is any combination of one or more used medical plastic products and medical plastic products that expire and are not used. The high-strength fiber bundles are more than one bundle of fiber materials commonly used for manufacturing geogrids on the market. The modified filler is a stabilizer for improving the stability of component materials to heat and light. The processing aids are enhancers for improving the performance of the component materials.
-
公开(公告)号:US20240158994A1
公开(公告)日:2024-05-16
申请号:US18284418
申请日:2022-10-31
Applicant: SHANDONG JIAOTONG UNIVERSITY , SHANDONG UNIVERSITY , CHONGQING UNIVERSITY , JINAN JINYUE HIGHWAY ENGINEERING CO., LTD.
Inventor: Xinzhuang CUI , Jin LI , Qing JIN , Shen ZUO , Dalu XIONG , Peng JIANG , Xiaoning ZHANG , Yefeng DU , Kai YUAN , Chongsheng XIN
CPC classification number: E01C3/04 , C08F220/281 , C08K3/22 , C08K3/346 , E01C3/003 , E01C19/00 , C08K2201/014
Abstract: An adjustment method of moisture content and dense state for a hydrogel improved subgrade based on weather-resistance during an in-service period, including: step 1: carrying out surface cleaning and compaction of ground; step 2: preparing hydrogel improved subgrade raw material; step 3: paving the prepared material on the surface to form first-layer improved subgrade; and step 4: paving plain soil subgrade onto the first-layer. The method combines the water absorption and release function of the modified resin and the characteristic of the gel state thereof, to pave the improved subgrade in layers, which can absorb water and slightly expand when the water content in the subgrade is increased to a certain threshold value, and a strength and compactness protective layer can also be formed at the connection sections of the ground and the subgrade, and the subgrade and the pavement, to prevent the pot-cover effect from occurring.
-