-
公开(公告)号:US20240190006A1
公开(公告)日:2024-06-13
申请号:US18536727
申请日:2023-12-12
Applicant: Samsung Electronics Co., Ltd.
Inventor: Hyungho Choi , Kwangjun Kim , Jinho So , Huigwan Lee , Hyunkook Jeon , Soonwook Hwang
CPC classification number: B25J9/1679 , B25J9/08 , B25J9/106
Abstract: A gas supply stage includes a gas supply cabinet and a fastening vehicle. The gas supply cabinet includes a cabinet frame including an inner space configured to house a gas container and a holding module including a connector holder configured to be detachably fastened to a valve nozzle. The fastening vehicle includes a traveling unit configured to travel in a facility space in which the gas supply cabinet is installed, a multi-axis robot attached to the traveling unit, and a module gripper mounted to the multi-axis robot and configured to detachably grip a valve manipulation module and the holding module.