公开(公告)号:US20190168357A1
公开(公告)日:2019-06-06
申请号:US16208592
申请日:2018-12-04
Applicant: Taiyuan University of Technology
Inventor: Zhixin JIN , Chunwang ZHANG , Guorui FENG , Xuanmin SONG , Shengyong HU , Yujiang ZHANG , Tingye QI , Zhen LI
Abstract: A rock sanding device includes a base, a bottom sanding plate, an adjustable connecting rod, an elastic loader, a connector, a side sanding brush, a top sanding plate, an inner rod, a prong and a drill rod. The top of the drill rod is fixedly connected with the rotating shaft of the external water drilling rig and the external water drilling rig has a water inlet joint to introduce water into the drill rod. The inner rod and drill rod are connected and fixed coaxially, and the bottom of the drill rod is symmetrically welded with four prongs. The rock specimen is placed in the center of the side sanding brush. The top sanding plate and the bottom sanding plate are provided in the top side and bottom side of the rock specimen, respectively.
-
公开(公告)号:US20220244153A1
公开(公告)日:2022-08-04
申请号:US17586061
申请日:2022-01-27
Applicant: Taiyuan University of Technology
Inventor: Guorui FENG , Tingye QI , Jinwen BAI , Chao SONG , Shuiyun HOU , Lirong LI , Yanqun YANG , Xudong SHI
Abstract: A device and method for testing the bearing capacity of grouped pillars in the inclined goaf under coupled biaxial static and disturbance stresses are provided. Four protection rings are arranged on a base, each protection ring is installed with one machine frame therein, a bottom end of the machine frame is connected with the base and a top end thereof is connected with a transverse frame. Sliding rails are arranged on two sides of the base, side frames are installed on the sliding rails. A vertical force loading device is arranged at a bottom of a workbench, transverse force loading devices are arranged on inner sides of the side frames respectively. A force disturbance device is arranged at the bottom of the transverse frame. An upper slidable clamping seat and an upper pressure disk are arranged above the samples, and a lower slidable clamping seat is arranged below the samples.
-
公开(公告)号:US20220282619A1
公开(公告)日:2022-09-08
申请号:US17752842
申请日:2022-05-24
Applicant: Taiyuan University of Technology
Inventor: Guorui FENG , Yijiang FAN , Pengfei WANG , Chenliang HAO , Xiaoze WEN , Jun GUO , Jinwen BAI , Tingye QI , Jianan LIU , Linjun ZHU , Changquan WU
Abstract: A method for carrying out grouting between adjacent gateroads in internal-staggered split-level coal mining. A return air gateroad of a stoping face and an inlet air gateroad of a heading face are not on the same level. The return air gateroad of the stoping face is arranged along a roof of a coal seam. The inlet air gateroad of the heading face is arranged along a floor of the coal seam. There is a height difference between the return air gateroad and the inlet air gateroad in a vertical direction. During the construction process, the inlet air gateroad is excavated at a delay distance of 180-200 meters from the return air gateroad. The drilling and grouting are performed while excavating the roadway, where grouting holes are arranged in a single row. A device for implementing the method is also provided.
-
4.
公开(公告)号:US20240209734A1
公开(公告)日:2024-06-27
申请号:US18595263
申请日:2024-03-04
Applicant: Taiyuan University of Technology
Inventor: Guorui FENG , Wei GUO , Tingye QI , Zhu LI , Jiaqing CUI , Yekai CUI , Jingkai MA
IPC: E21C41/18
CPC classification number: E21C41/18 , E21C2100/00
Abstract: An I-patterned filling method for an initial stage of coal mining based on roof fracture characteristics is provided. A relationship between an overburden load borne by a main roof and an overhang size is determined based on principle of virtual work and a surgery theory when an overhang distance of the main roof reaches an initial weighting interval to enter a plastic limit state with an advance of a working face to obtain the initial weighting interval. An initial fracturing interval of an immediate roof is obtained in the same way. According to a subsidence law of the main roof in an inverted hip roof form, the filling is performed at a key position around an internal plastic hinge line through I-patterned three-strip filling. Size parameters of the I-pattered filling are designed to prevent the immediate roof and the main roof from being fractured.
-
-
-