摘要:
Rehabilitation machine (10) for railway road beds, which comprises a framework (11) rested on a front bogie (12) and rear bogie (13), cabs (14-15) to drive the machine during its travels, an excavation chain (20) cooperating with a hopper (21) in the transfer of excavated material onto an elevator (22), and a leading end (24) and trailing end (124) relative to the direction of advance (19) of the machine (10), and also comprises at one end a first front conveyor (27) to deliver a mixture of aggregate materials (26) and a second front conveyor (33) to deliver metalling (32) towards the machine (10) and also discharge conveyors (23) to discharge excavated material from the machine (10).
摘要:
A sealing and guiding device for the injection piston (3) of a hot chamber pump for corrosive alloys made up of a body (1) in which a chamber (6) and an injection cavity (2) therebelow are formed, wherein the piston (3) slides with a vertical reciprocating motion (V), includes a bush (8), having an outer diameter smaller than said chamber (6), interposed between centering members housed in the chamber (6) and made coaxial with the chamber (6) and with the piston (3) by a pair of opposite surfaces of revolution (12, 13) formed on said centering members, the upper surface (13) and the relevant centering member performing a pressure-tight sealing. The outer lateral surface (15) of the bush (8) is in communication with the injection cavity (2) whereas the upper side of the bush (8) is in communication with the crucible and immersed therein at a depth (L), measured from the lowest level (23) reachable by the molten alloy, which is greater than the maximum travel (C) of the piston (3). The inner surface (21) of the bush (8) is a surface of revolution with diameter just larger than the piston (3).
摘要:
Machine to clean and rehabilitate railway ballast and railway road beds, which can: (1) remove the ballast, clean the ballast and then replace the ballast, or (2) remove the old ballast and replace it with new ballast. The machine, while riding on the railroad tracks, can remove the metalling of the ballast from the railroad track, then run the material through a riddle to clean the metalling, and finally replace the material. Alternatively, the machine may remove the metalling, then by reversing the direction of a distrubution conveyor, the machine can replace the old metalling with entirely new metalling brought to the distribution conveyor by various feed conveyors. In this alternative mode of operation, the machine can lay a two layered ballast consisting of two different materials.